Talk:Baku–Tbilisi–Kars railway

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia


Untitled[edit]

I will move this page to a new title, to preserve the geographic order of cities that this railway will connect, that is, it starts in Kars goes through Tbilisi to Baku, so it's Kars-Tbilisi-Baku railway. Google hits seem to agree on this as well [1] - 437 hits with "Kars-Tbilisi-Baku railway" vs. [2] - 7 hits with "Kars-Baku-Tbilisi railway. Thanks. Atabek (talk) 17:37, 27 December 2007 (UTC)[reply]

Geography note[edit]

The page about this railroad is marked with flag as European railroad. But the map show it's proposed to be laid wholly in Asia. Should the flag to be changed on Asian railroad? —Preceding unsigned comment added by 87.117.3.43 (talk) 19:47, 17 November 2009 (UTC)[reply]

Turkey east of the Bosposrus is undisputedly Asia. But Georgia claims it is part of Europe (it even claims to be the origin or Europe!), although geography textbooks generally consider the northern boundary of Georgia the boundary between Europe and Asia. Even Armenia considers itself part of Europa. This is politically sensitive, and there is no "official" boundary between Europe and Asia anyway. Rbakels (talk) 19:19, 15 August 2013 (UTC)[reply]


What I don't understand that it says that a train from South Korea to Istanbul took 15 days via China and Kazhakstan? How did the train skip North Korea????? — Preceding unsigned comment added by Newsted81 (talkcontribs) 07:10, 2 February 2017 (UTC)[reply]

Break of Gauge[edit]

Ideally the break of gauge and the main freight transhipment terminal should be at or near the national capital of Tbilisi rather than at a relatively minor border station, namely Akhalkalaki.

Tabletop (talk) 09:57, 15 January 2008 (UTC)[reply]

Pitching to be an advisor, are we? Trouble is, the line already runs to Akhalkalaki, and infact to a substantial distance beyond that. —Preceding unsigned comment added by 84.67.58.55 (talk) 18:08, 26 September 2008 (UTC)[reply]

Gauge[edit]

Dual gauge tracks in Wallaroo, South Australia. The outer rail on the right is for Australia Broad Gauge (still in use by an occasional tourist train), the inner rail is for standard gauge (discontinued further along the line, and disused)

Kars–Tbilisi–Baku railway#Gauge. Dual gauge between 1,435 mm (4 ft 8+12 in) and 1520 would require 4 rails because the small difference of 85 mm (3.35 in) simply does not allow 3 rail dual gauge track. 1600 and 1,435 mm (4 ft 8+12 in), with a difference of 165 mm (6.5 in), is about as close as one can get to be able to have 3 rail dual gauge. See rail gauge in Australia. Peter Horn User talk 01:40, 18 August 2009 (UTC)[reply]

Quite so! Same with 1000 and 1067 in southern Africa. However just as Russia wants to extend its broad gauge to Vienna, Europe may want to extend standard gauge to central Asia, to reduce transshipment costs. Tabletop (talk) 03:48, 18 August 2009 (UTC)[reply]
There may be an expensive solution, a specially designed cross section rolled steel rail, a flanged inverted U with a groove on a wide flat top. Peter Horn User talk 19:25, 18 August 2009 (UTC) Quite so! Tabletop (talk) 10:58, 22 August 2009 (UTC)[reply]
This might be suitable for slow speed lines only.
Rolling a special cross-section or trimming a standard rail to fit would be expensive. One solution might be to use the special flatter and thick rail used for switchblades in tangential turnouts.. Tabletop (talk) 23:52, 18 August 2009 (UTC)[reply]

Dual gauge between the Indian gauge of 1676 or the Iberian gauge of 1668 and the standard gauge of 1,435 mm (4 ft 8+12 in) also exists because the difference of 9.5 inches (241 mm) or 233 mm (9.17 in) allows it. Peter Horn User talk 19:12, 18 August 2009 (UTC) Peter Horn User talk 18:49, 19 August 2009 (UTC)[reply]

I used "copy and paste" to send this entire discussion to Talk:Dual gauge#Dual, tripple and multiple rail gauge. Peter Horn User talk 18:35, 27 August 2009 (UTC)[reply]

Completion date slipping again?[edit]

Not sure if worth updating at this point; but spotted this today quoting Azerbaijani PM: "All financial issues are settled and the railway will be built completely on the end of 2012 or may be on the beginning of 2013" http://times.am/?l=en&p=3146 Scrumph (talk) 12:14, 22 December 2011 (UTC)[reply]

This page http://www.neurope.eu/article/tbilisi-baku-see-railway-completed-late-2014 says completion is now scheduled for end 2014. Rbakels (talk) 19:15, 15 August 2013 (UTC)[reply]

Blacklisted Links Found on the Main Page[edit]

Cyberbot II has detected that page contains external links that have either been globally or locally blacklisted. Links tend to be blacklisted because they have a history of being spammed, or are highly innappropriate for Wikipedia. This, however, doesn't necessarily mean it's spam, or not a good link. If the link is a good link, you may wish to request whitelisting by going to the request page for whitelisting. If you feel the link being caught by the blacklist is a false positive, or no longer needed on the blacklist, you may request the regex be removed or altered at the blacklist request page. If the link is blacklisted globally and you feel the above applies you may request to whitelist it using the before mentioned request page, or request its removal, or alteration, at the request page on meta. When requesting whitelisting, be sure to supply the link to be whitelisted and wrap the link in nowiki tags. The whitelisting process can take its time so once a request has been filled out, you may set the invisible parameter on the tag to true. Please be aware that the bot will replace removed tags, and will remove misplaced tags regularly.

Below is a list of links that were found on the main page:

  • http://www.railway-technology.com/projects/baku-tbilisi-kars/
    Triggered by \brailway-technology\.com\b on the local blacklist

If you would like me to provide more information on the talk page, contact User:Cyberpower678 and ask him to program me with more info.

From your friendly hard working bot.—cyberbot II NotifyOnline 11:08, 3 April 2014 (UTC)[reply]

 Resolved This issue has been resolved, and I have therefore removed the tag, if not already done. No further action is necessary.—cyberbot II NotifyOnline 21:22, 9 April 2014 (UTC)[reply]

ბაქო-თბილისი-ყარსის პროექტი[edit]

ბაქო-თბილისი-ყარსის პროექტი არის ახალი სატრანსპორტო დერეფანი, რომელიც გააერთიანებს აზერბაიჯანის, საქართველოსა და თურქეთის სარკინიზო ხაზებს.

ამ პროექტის განხორციელების შედეგად, თურქეთის გავლით, გაიხსნება სარკინიგზო დერეფანი კასპიის ზღვიდან ევროპისკენ, რომელიც საბოლოოდ გამორიცხავს საზღვაო გზით გადაზიდვის საჭიროებას მას მერე, რაც სტამბულში, ბოსფორის სრუტეში გამავალი რკინიგზის გვირაბის მშენებლობა დასრულდება. ბაქო-თბილისი-ყარსის პროექტით ასევე შესაძლებელი იქნება დერეფნის გახსნა, რომელიც რუსეთს თურქეთთან დააკავშირებს. ამ ხაზით მოხდება როგორც სატვირთო, ისე სამგზავრო გადაყვანები და ის მოიაზრება როგორც ალტერნატიული სატვირთო ტრანსპორტირების გზა ირანიდან მომავალი არსებული სატრანზიტო გზების ნაცვლად. კომპანიის მენეჯმენტი ფიქრობს, რომ ახალი სარკინიგზო ხაზი გაზრდის ტვირთბრუნვის, კერძოდ კონტეინერებით გადაზიდვადი ტვირთის მოცულობას, თუმცა იმის გამო, რომ სარკინიგზო გზა ახალია, მენეჟმენტის აზრით, მნიშვნელოვანი მოცულობის მიზიდვას დრო დასჭირდება. ამჟამინდელი ტვირთბრუნვის მიხედვით და სარკინიგზო ხაზის დაგეგმილ დროს გახსნის შემთხვევაში, მენეჯმენტი ფიქრობს, რომ 2015 წლისთვის კომპანიას შეეძლება შეცვალოს ამჟამად არსებული მინიმუმ 2 მილიონი ტონა ტვირთის გადაზიდვის მარშრუტი (უმთავრესად მშრალი ტვირთის, რომელის გადაზიდვაც ამჟამად სატვირთო მანქანებით ხდება) თურქეთის, კავკასიის, რუსეთისა და ცენტრალური აზიას შორის.


ბაქო_თბილისი_ყარსის სარკინიგზო მაგისტრალის პროექტის განხორციელება 2007 წელს დაიწყო, მშენებლობა კი 2008 წელს და იგი ითვალისწინებს საქართველოს ტერიტორიაზე მარაბდა – ახალქალაქის სარკინიგზო ხაზის რეაბილიტაცია-რეკონსტრუქციას და ახალი სარკინიგზო ხაზის მშენებლობას ახალქალაქიდან თურქეთის საზღვრამდე.

მენეჯმენტის აზრით, თურქეთსა და ცენტრალურ აზიას შორის გაზრდილი ვაჭრობა უზრუნველყოფს მნიშვნელოვან შესაძლებლობას სავაჭრო ნაკადის მისაპოვებლად, კერძოდ ცენტრალური აზიიდან თურქეთში იმპორტირებული ნედლეულისა და თურქეთიდან ექპორტირებული პროდუქციის. თურქულ-რუსული ვაჭრობის გათვალისწინებით, მენეჯმენტის აზრით, არსებობს დამატებით მოცულობის მოპოვების შესაძლებლობა, კერძოდ მშრალი ტვირთის, რომლის გადაზიდვაც ამჟამად ირანის, ან რუსულ-შავი ზღვის გზით ხდება. — Preceding unsigned comment added by 149.3.110.17 (talk) 09:53, 12 July 2014 (UTC)[reply]

Sixth trilateral meeting[edit]

The sixth trilateral meeting (also announced [3]) seems not to have happened, why not? --Ysangkok (talk) 11:29, 12 January 2017 (UTC)[reply]

External links modified[edit]

Hello fellow Wikipedians,

I have just modified one external link on Baku–Tbilisi–Kars railway. Please take a moment to review my edit. If you have any questions, or need the bot to ignore the links, or the page altogether, please visit this simple FaQ for additional information. I made the following changes:

When you have finished reviewing my changes, you may follow the instructions on the template below to fix any issues with the URLs.

This message was posted before February 2018. After February 2018, "External links modified" talk page sections are no longer generated or monitored by InternetArchiveBot. No special action is required regarding these talk page notices, other than regular verification using the archive tool instructions below. Editors have permission to delete these "External links modified" talk page sections if they want to de-clutter talk pages, but see the RfC before doing mass systematic removals. This message is updated dynamically through the template {{source check}} (last update: 18 January 2022).

  • If you have discovered URLs which were erroneously considered dead by the bot, you can report them with this tool.
  • If you found an error with any archives or the URLs themselves, you can fix them with this tool.

Cheers.—InternetArchiveBot (Report bug) 01:05, 14 July 2017 (UTC)[reply]

External links modified[edit]

Hello fellow Wikipedians,

I have just modified 2 external links on Baku–Tbilisi–Kars railway. Please take a moment to review my edit. If you have any questions, or need the bot to ignore the links, or the page altogether, please visit this simple FaQ for additional information. I made the following changes:

When you have finished reviewing my changes, you may follow the instructions on the template below to fix any issues with the URLs.

This message was posted before February 2018. After February 2018, "External links modified" talk page sections are no longer generated or monitored by InternetArchiveBot. No special action is required regarding these talk page notices, other than regular verification using the archive tool instructions below. Editors have permission to delete these "External links modified" talk page sections if they want to de-clutter talk pages, but see the RfC before doing mass systematic removals. This message is updated dynamically through the template {{source check}} (last update: 18 January 2022).

  • If you have discovered URLs which were erroneously considered dead by the bot, you can report them with this tool.
  • If you found an error with any archives or the URLs themselves, you can fix them with this tool.

Cheers.—InternetArchiveBot (Report bug) 11:57, 17 January 2018 (UTC)[reply]

Why the picture of FLIRT set?[edit]

--Oldboltonian (talk) 21:52, 24 February 2021 (UTC)[reply]