Quantity take-off

From Wikipedia, the free encyclopedia

Quantity take-offs (QTO) are a detailed measurement of materials and labor needed to complete a construction project. They are developed by an estimator during the pre-construction phase. This process includes breaking the project down into smaller and more manageable units that are easier to measure or estimate. The level of detail required for measurement may vary.[1] These measurements are used to format a bid on the scope of construction. Estimators review drawings, specifications and models to find these quantities. Experienced estimators have developed procedures to help them quantify their work. Many programs have been developed to aid in the efficiency of these processes. With BIM quantity take-off can be conducted almost automatically given that the type of materials, their quantity and price is included in the model.[2] It is known that construction projects often run overtime and over budget[3] and one of the reasons is lack of accuracy in quantity takeoff and estimates.[4]

Importance of quantity takeoff[edit]

For every project's success accurate quantity takeoff is necessary. It minimizes many risks during the project. By leveraging precise quantity data, professionals can streamline project management, maintain budgetary control, and foster collaboration among stakeholders.[2]

References[edit]

  1. ^ Hendrickson, Chris; Hendrickson, Chris T.; Au, Tung (1989). Hendrickson, C. (1998). "Project Management for Construction, Fundamental Concepts for Owners, Engineers, Architects and Builders" First Edition originally printed by Prentice Hall, 1989 with co-author Tung Au. ISBN 0-13-731266-0.
  2. ^ a b Masood, Jawad (12 July 2023). "What is Quantity Takeoff: Unlocking the Key to Accurate Construction Cost Estimation". Engineer Jawad.
  3. ^ "Piryonesi, S. M., Nasseri, M., & Ramezani, A. (2018). Resource leveling in construction projects with activity splitting and resource constraints: a simulated annealing optimization. Canadian Journal of Civil Engineering, 46(999), 81-86". doi:10.1139/cjce-2017-0670. hdl:1807/93364. S2CID 116480238. {{cite journal}}: Cite journal requires |journal= (help)
  4. ^ Anderson, S. D.; Molenaar, K. R.; Schexnayder, C. J. (2007). Guidance for cost estimation and management for highway projects during planning, programming, and preconstruction. Vol. 574. Transportation Research Board.