Line 19 (Chengdu Metro)

From Wikipedia, the free encyclopedia
Chengdu Metro Line 19
19
Overview
StatusOperational
OwnerCity of Chengdu
LocaleChengdu, Sichuan
Termini
Stations18
Service
TypeRapid transit
SystemChengdu Metro
Operator(s)Chengdu Metro Corporation
Depot(s)Yongyi Depot (永义车辆段)
Wutongmiao Depot (五桐庙停车场)
Changshuncun Depot (长顺村停车场)
History
Opened18 December 2020; 3 years ago (2020-12-18)[1]
Technical
Line length60.139 km (37.4 mi) (in operation)
Number of tracks2
Characterunderground, some elevated
Track gauge1435
Electrificationoverhead lines, 25,000 V AC
Operating speed140km/h[2]

Line 19 of the Chengdu Metro is a metro line in Chengdu. The whole line is 62.69 km. The line uses 8-car Type-A trains operating up to 140 km/h speed powered by 25kV AC overhead lines.[3]

It was opened in 18 December 2020 as a part of Line 17 Phase 1. On September 17, 2023, original Line 17 Phase 1: (Jinxing - Jitouqiao) splits into Line 19 Phase 1: (Jinxing - Jiujiang North) and new Line 17: (Jiujiang North - Jitouqiao), and 4-Car A-Train starts operation on Line 17. All passengers must transfer at the same platform at Jiujiang North between line 17 and line 19.[4][5]

Line 19 Phase 2 will have local and express services. It will connect Chengdu Tianfu International Airport and Chengdu Shuangliu International Airport with direct express service.[6] Phase 2 has opened on 28 November 2023, of which Tianfu station will only provide interchange with line 18,[7] and will be fully open when Tianfu railway station of China Railway opens.[8]

Stations[edit]

Service routes Station

Station name Transfer Distance
km
Borough
English Chinese
19 01 Jinxing 金星 —— 0 Wenjiang
19 02 Huangshi 黄石 4.442 4.442
19 03 Chengdu Fifth People's Hospital 市五医院 2.935 7.377
19 04 Fengxihe 凤溪河 4 1.858 9.235
19 05 Wenquan Avenue 温泉大道 2.084 11.319
19 06 Mingguang 明光 1.784 13.103
19 07 Jiujiang North 九江北 17 6.721 19.824 Shuangliu
19 08 Longqiao Road 龙桥路 3 4.477 24.301
19 09 East of Terminal 2 of Shuangliu International Airport 双流机场2航站楼东  30 
10[note 1]
China Railway IPW

Chengdu Shuangliu International Airport CTU

5.604 29.905
19 10 Longgang 龙港  8  4.643 34.548
19 11 Wenjiashan 温家山 5.840 40.388
19 12 Muhua Road 牧华路 1.457 41.845
19 13 Yixin Lake 怡心湖 5 2.180 44.025 Tianfu New Area
19 14 Zhengxingwan 正兴湾 2.696 46.721
19 15 Honglian 红莲  S5  3.318 50.039
19 16 Tianfu Commercial District 天府商务区 6 2.386 52.425
19 17 Lanjiadian 蓝家店 2.606 55.031
19 18 Tianfu Station[note 2] 天府站 18
China Railway Tianfu (U/C)
5.108 60.139
Through-service to/from Tianfu International Airport North of Line 18
19 19 Hejiang[note 3] 合江 2.414 62.553 Tianfu New Area

Notes[edit]

  1. ^ Out-of-system interchange via Terminal 2 of Shuangliu International Airport
  2. ^ Only interchange between Lines 18 and 19 available, no entrances and exits at the moment.
  3. ^ Hejiang station is a long-term reserved station and not operational at the moment.

References[edit]

  1. ^ "12月18日五线齐发,成都轨道交通运营里程突破500公里!".
  2. ^ "成都轨道交通17号线二期工程可行性研究及勘察设计总承包招标公告" (in Chinese). 四川日报. 2017-08-01. Retrieved 2017-08-01.
  3. ^ "成都轨道交通17号线二期工程可行性研究及勘察设计总承包招标公告" (in Chinese). 四川日报. 2017-08-01. Retrieved 2017-08-01.
  4. ^ "地铁17号线"一拆为二" 来看看会有哪些变化" (in Chinese).
  5. ^ "成都地铁19号线二期开通在即 17号线将在九江北站"分家"" (in Chinese).
  6. ^ "地铁19号线将实现新旧机场互联互通" (in Chinese). 网易. 2015-09-27. Archived from the original on 2021-01-09. Retrieved 2015-09-27.
  7. ^ "官宣!11月28日,19号线二期开通初期运营!". 27 November 2023.
  8. ^ "Chengdu Metro Line 19 Phase II is Officially Open".