IRR Transversal Line

From Wikipedia, the free encyclopedia
Map
Map of the IRR Transversal Line.
IRR Transversal Line
Kirkuk To Haditha
km
To Erbil
0
Kirkuk Railway Station
To Baghdad Via Baquba
16
Thawra Railway Station
48
Riyadh Railway Station
65
Marai Railway Station
Over Tigris
94
Northern Baiji/Fudha Railway Station
IRR Northern to Rubaiye
107
Baiji Central Railway Station
IRR Northern to Baghdad
130
Siniya Railway Station
155
Tharthar Railway Station
Over Tharthar River
172
Safa Railway Station
73.0
Wadi Railway Station
192
Hidab Railway Station
232
Ata Railway Station
252
Haditha Railway Station
To Akashat

The IRR Transversal Line or the Haditha-Kirkuk Railway (Route Number 4) is a railway line of the Iraqi Republic Railways that connects Haditha and Haqlaniyah with Kirkuk via Bayji. It is a single-track unelectrified line. The railway is about 252 km (157 mi) long and has a maximum travel speed of 100 km/h (62.1 mph). Unlike other Iraqi rail lines, it does not end at Baghdad. At present, the railway line is operational for freight transport only between Haditha and Baiji. However, the damaged truss-bridge over the Tigris has halted the resumption of services to Kirkuk. The railway line's state is notably deteriorated, reflecting the widespread disrepair and of Iraq's rail infrastructure. [1]

Technical Specifications[edit]

The Railway Line had a fully automatic electric centralized traffic control system since its inauguration in 1987. The Railway Line possessed a network of telegraph cables running parallel to the rails which provided connections between the stations and locomotives. As of October 2018, the signalling and communication systems are both out of service.[1]

The Line has two light maintenance workshops at Kirkuk and Haqlaniya and one heavy maintenance factory at Baiji.[1]

The track gauge is 1435 millimetres (standard-gauge). The rails have a UIC 60 profile and consist of welded joints. The axel load is 25 tons.[1]

History[edit]

Early Developments and Metre-Gauge Railway[edit]

Ever since the latter half of the 19th century, a railway line to Kirkuk was discussed but due to the Great War construction was postponed. Eventually, construction on the Kirkuk Railway Station commenced in 1925 while the foundations for the Kirkuk-Baghdad-Haifa Railway were laid beginnning in 1930. The idea of the section from Baghdad to Haifa was abandoned due to the Arab-Israeli War. In 1949, a 105-kilometre extension to Erbil had started with a steel bridge over the Great Zab River near Al-Tun and the first train arrived in Erbil by 1950. An undertaking for an extension to Sulamaniya was initiated by the then Iraqi Director of Railways Major General Saleh Zaki Tawfiq in 1963. Still, it was eventually abandoned with the regime change in 1968.[2] It is to be noted that the current Transversal Line and the aforementioned railway only minimally share trackage.

Poster from the days of the metre-gauge railway.

Standard-Gauge Railway[edit]

It was planned by the Ba'athist Regime to replace the original railway with a standard-gauge railway. They renewed the idea of also extending the line to Sulaymaniya. However, after further consideration, it was decided to construct a brand new standard-gauge railway from Kirkuk to Haditha with an interchange at the Berlin-Baghdad Railway at Baiji The construction of the railway line started on August 26th, 1982. Still, because of the Iran-Iraq War, the opening was delayed.[2] The new line opened in 1988. A ground-breaking ceremony by the then Minister of Communication Mohammed Hamza Al Zubaidi was held on November 7th, 1987. The cost for the construction of the new line was 960 million USD.[3]

The metre-gauge railway that connected Erbil and Baghdad via Baquba and Kirkuk was closed in 1984 by the Office of the Presidency of the Iraqi Republic. The new railway made the old connection obsolete. Due to the retrofiting of the IRR Southern Line from metre- to standard-gauge in 1964, the old railway lost its interoperability with it. Other, unstated reasons were to not only connect Kirkuk better to other Sunni Arab areas in the west of Iraq to make Arabisation easier, but to also cut off railway access to Kurdish areas following the autonomy of Iraqi Kurdistan in 1970. As a result, many landmarks along the old line, such as the Erbil Railway Terminal, the Baba Kiwan Junction, multiple bridges, and various facilities such as hotels and hospitals, were demolished. It was the last railway of its type in Iraq. [2][4]

Another reason for the relocation of the route was the now double connection of the Haditha oil refinery, in the west of Iraq, to the Iraqi railway network, but also to the north of Iraq. [5]

Recent progress[edit]

On November 8, 2022, the Baiji Field Branch was rehabilitated by the Central Government.[6] That way freight trains are able to once again travel between Baghdad and Qaim.[5][7] Currently, there is no progress on rehabilitating the Kirkuk Branch due to the ongoing conflict between Baghdad and Erbil over the disputed territories of Northern Iraq, of which Kirkuk is part.[8]

References[edit]

  1. ^ a b c d Alwan, SR ENGR Safa; Hanoon, SR ENGR Isra (October 2018). "Irak". Proceedings of the 12th Meeting of the COMCEC Transport and Communications Working Group. COMCEC: 34. Retrieved January 2, 2024.
  2. ^ a b c Abdul Aziz, M.D. Dilshad Omar (July 2017). "تاريخ السكك الحديد في كركوك وأثره االقتصادي واالجتماعي" [History of the Railways in Kirkuk and their economic and social impact]. (مجلة علمية محكمة)مجلة الدراسات التاريخية و الحضارية [Journal of Historical and Cultural Studies(a peer-reviewed scientific journal)] (in Arabic). 9 (30): 38. Retrieved January 2, 2024.
  3. ^ As of 2024 about 2.5 billion US-Dollars, 2.3 billion Euro, 3.2 trillion IQD. ↑
  4. ^ Grantham, Andrew (8 February 2014). "Railway lines in Iraq". andrewgrantham.co.uk. Retrieved January 2, 2024. A groundbreaking ceremony was held in Baiji on February 8 1983. Ceremonial inauguration of the KBH in the presence of the then Minister of Communication Mr Mohammed Hamza Al Zubaidi on November 7 1987 (not 1988).
  5. ^ a b Salem, Amr (August 2, 2023). "Iraq plans to operate high-speed trains". Iraqi News. Retrieved April 2, 2024. The Iraqi official added that the railway between Baiji and Al-Qaim will be reopened soon as it will transport oil derivatives between Baiji and Haditha refineries, noting that the Development Road project will provide the necessary infrastructure for these trains.
  6. ^ Lee, John (November 19, 2023). "8 Iraqi Rail Lines Re-Opened in Past Year". iraq-business news. Retrieved January 2, 2024. The rehabilitated Baiji field line, opened on November 5, 2022
  7. ^ Muhsen, Majda (February 11, 2024). "Iraq rehabilitates war-damaged railway line". Zawya.com. London Stock Exchange Group. Retrieved April 2, 2024. A press statement by the Ministry said that line was used to transport goods and aggregate from the Al -Qa'im district in the western region to Haditha district, and then to Baiji in the eastern region, and onwards to Baghdad.
  8. ^ Husamedin, Hiwa (March 5, 2016). "Baghdad deliberately suspends Kirkuk railway projects, lawmakers say". Rudaw.net. Rudaw Media Network. Retrieved January 2, 2024. The railway is a long-term plan very much needed to connect the city with the rest of Iraq and Kurdistan region but apparently Baghdad believes it is a waste of money if Kirkuk chooses to stay with the Kurdistan region