Draft:Drumul Expres 16
Submission declined on 28 April 2024 by Theroadislong (talk). This draft's references do not show that the subject qualifies for a Wikipedia article. In summary, the draft needs multiple published sources that are:
Where to get help
How to improve a draft
You can also browse Wikipedia:Featured articles and Wikipedia:Good articles to find examples of Wikipedia's best writing on topics similar to your proposed article. Improving your odds of a speedy review To improve your odds of a faster review, tag your draft with relevant WikiProject tags using the button below. This will let reviewers know a new draft has been submitted in their area of interest. For instance, if you wrote about a female astronomer, you would want to add the Biography, Astronomy, and Women scientists tags. Editor resources
|
Oradea-Arad expressway | |
---|---|
Location | |
Country | Romania |
Highway system | |
The DEx16 (Romanian: Drumul Express 16) is an expressway serving as the current beltway around Oradea, connecting it with the border crossing with Hungary at Bors II via the A3 motorway. It has a current length of 19km and it is expected to further connect the cities of Oradea and Arad in western Romania via the already existing A11 motorway.[1]
Construction[edit]
The DEx 16 is split into 3 lots, with only the first one being completed as of April 2024:
- A3 - Oradea (19 km) incl. the DN1Y access road from Oradea to the DEx16
- Oradea - Salonta (33,7 km) incl. a 5,3km access road from DN79 to Salonta
- Salonta - Chisineu-Cris (39,7 km) incl. a 10km access road from Chisineu Cris to the Hungarian border crossing
- Chisineu-Cris - Arad (47,07 km) incl. a 2,9km access road to the Arad Industrial Zone
References[edit]
- ^ "Drum Expres DEx16 Arad - Oradea". www.130km.ro. Retrieved 2024-04-28.