Dazhou station (Guangzhou Metro)

Coordinates: 23°09′59″N 113°13′47″E / 23.166369°N 113.229667°E / 23.166369; 113.229667
From Wikipedia, the free encyclopedia
Dazhou

大洲
Guangzhou Metro
Platform
Chinese name
Simplified Chinese大洲站
Traditional Chinese大洲站
Transcriptions
Standard Mandarin
Hanyu PinyinDàzhōu Zhàn
Yue: Cantonese
Jyutpingdaai6zau1 zaam6
General information
LocationDazhou Road (大洲路) within Dazhou Village (大洲村), Shibi Subdistrict, Panyu District, Guangzhou, Guangdong
China
Coordinates23°09′59″N 113°13′47″E / 23.166369°N 113.229667°E / 23.166369; 113.229667
Operated byGuangzhou Metro Co. Ltd.
Line(s)     Line 7
Platforms2 (1 island platform)
Tracks2
Construction
Structure typeUnderground
AccessibleYes
Other information
Station code7 01-1
History
Opened1 May 2022
Previous namesWeichong (韦涌) (planning name)
Services
Preceding station Guangzhou Metro Following station
Chencunbei
towards Meidi Dadao
Line 7 Guangzhou South Railway Station
towards Yanshan

Dazhou Station (Chinese: 大洲站; pinyin: Dàzhōu Zhàn; Jyutping: daai6zau1 zaam6) is a station of Guangzhou Metro Line 7, located underground within Dazhou Village on Dazhou Road, Shibi Subdistrict, Panyu District, Guangzhou, Guangdong Province, China.[1] The station was opened on 1 May 2022, with the opening of the western extension of Line 7.[2][3][4] This is the last station on the line westbound before it enters Foshan's Shunde District.

History[edit]

The station was handed over to the '3 Powers' on 21 October 2021, making it the first station on the western extension of Line 7 to do so.[5]

Station information[edit]

G Street level Exits B, D
L1
Concourse
Lobby Customer Service, Shops, Vending Machines, ATMs
L2
Platforms
Platform 2 arrow for L  7  towards Meidi Dadao (Chencunbei)
Island platform, doors will open on the left
Platform 1  7  towards Yanshan (Guangzhou South Railway Station) arrow for R
Exit number Exit location
Exit B Dazhou Industrial Road
Exit D Weida Road

[1]

Gallery[edit]

References[edit]

  1. ^ a b "大洲". Guangzhou Metro (in Simplified Chinese). Guangzhou Metro.
  2. ^ "广州地铁七号线西延段将于5月1日14时正式开通". 新快报 (in Simplified Chinese). 2022-04-30. Retrieved 2023-05-13.
  3. ^ "Straight ahead! Guangzhou Line 7 Shunde section preemptive trial ride! There is a "third toilet" in the station". LaiTimes. 2022-01-28. Retrieved 2023-05-14.
  4. ^ "Guangzhou Metro Line 7 extension opens on May 1". GD Today. 2022-05-02. Retrieved 2023-05-14.
  5. ^ "离开通又近了!广州7号线西延顺德段首批车站"三权"移交". 南方日报 (in Simplified Chinese). 2021-10-22. Retrieved 2023-05-13.