Jump to content

Talk:Helmsley Building/GA1

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

The following discussion is closed. Please do not modify it. Subsequent comments should be made on the appropriate discussion page. No further edits should be made to this discussion.


GA Review

[edit]
GA toolbox
Reviewing

Article (edit | visual edit | history) · Article talk (edit | history) · Watch

Reviewer: Vami IV (talk · contribs) 01:25, 28 August 2020 (UTC)[reply]


Opening statement

[edit]

Hello, and come what may from this review, thank you for your contributions to Wikipedia. During the review, I may make copyedits, which I will limit to spelling correction and minor changes to punctuation (removal of double spaces and such). I will only make substantive edits that change the flow and structure of the prose if I previously suggested and it is necessary. The Nominator(s) should understand that I am a grammar pedant, and I will nitpick in the interest of prose quality. For responding to my comments, please use  Done,  Fixed, plus Added,  Not done,  Doing..., or minus Removed, followed by any comment you'd like to make. I will be crossing out my comments as they are redressed, and only mine. A detailed, section-by-section review will follow. –♠Vami_IV†♠ 01:25, 28 August 2020 (UTC)[reply]

Site

[edit]
  • Should include the address here, as it is in the infobox.
    •  Done
  • The Helmsley Building measures 200 feet (61 m) north-south and 344 feet (105 m) west-east. This is frontage, yes?

Design

[edit]
  • The Helmsley Building was designed by Warren & Wetmore. When?
    • This is more of a passive verb, rather than something that happened at a point in time. Warren & Wetmore were the architects but there's no specific time given for when they designed it. epicgenius (talk) 15:12, 28 August 2020 (UTC)[reply]
  • There is a clock at the top of the base. The clock has a diameter of 9 feet (2.7 m), and is located 64 feet (20 m) above the ground. Combine and condense.
    •  Done
  • winged wheels representing advancement, wheels of progress, How are these distinct from each other?
  • The top of the Helmsley Building is a pyramid and capped by an ornate cupola. Delete the "and" here.
    •  Done
  • All of "Features" except "Lobby" - and "Forms" for that matter, could very easily fit into the main "Design" section. They would be very relevant there.

History

[edit]
  • [...] but also a great civic centre. Did the New York Times really use "centre"?
  • The final plan for the New York Central Building above Park Avenue were not completed [...] was not completed.
    •  Done
  • [...] foundational piers [...] Is there a link that can be added here?
    •  Done
  • Irving Brodsky of the New York Bank for Savings assumed a 50-year leasehold and renamed it the New York General Building. When did Brodsky do this?
  • Light shafts and TV screens were also installed, and bronze storefronts were installed. Two uses of "installed".
    •  Fixed
  • During the practice, What practice?
    •  Fixed

GA progress

[edit]

Article passes CopyVio with a 35.1% likelihood of violation. –♠Vami_IV†♠ 01:25, 28 August 2020 (UTC)[reply]

@Vami IV: Thanks for the review. I've addressed all of these comments. epicgenius (talk) 15:12, 28 August 2020 (UTC)[reply]
Good Article review progress box
Criteria: 1a. prose () 1b. MoS () 2a. ref layout () 2b. cites WP:RS () 2c. no WP:OR () 2d. no WP:CV ()
3a. broadness () 3b. focus () 4. neutral () 5. stable () 6a. free or tagged images () 6b. pics relevant ()
Note: this represents where the article stands relative to the Good Article criteria. Criteria marked are unassessed
The discussion above is closed. Please do not modify it. Subsequent comments should be made on the appropriate discussion page. No further edits should be made to this discussion.