Talk:Cranberry Street Tunnel
Appearance
This redirect does not require a rating on Wikipedia's content assessment scale. It is of interest to the following WikiProjects: | ||||||||||||||||||||
|
Untitled
[edit]Is the 27 TPH capacity in each direction or total? I am sure the Fulton St line carries more than that during peak rush hour, with 17 A trains scheduled to start at 207th St between 3:59pm and 4:57pm, and 7 C trains starting at 168th St between 3:57pm and 4:53pm (24 in total). Another 6 C trains run northbound from Euclid, and at least 8 A trains run northbound from Lefferts or Far Rockaway in the non-peak direction. That should total 38 trains, a lot more than 27.Avman89 (talk) 01:56, 6 December 2009 (UTC)