State Electricity Commission of Victoria: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
No edit summary
Line 43: Line 43:


===Expansion===
===Expansion===
The first capital works to be carried out by the SECV was the development of the [[Yallourn Power Station, Victoria|Yallourn Power Station]], briquette factory, and open-cut brown coal mine in the Latrobe Valley. Expansion was also carried out at the [[Newport Power Station, Victoria|Newport Power Station]] which was fuelled by imported black coal and Yallourn briquettes. Work on hydroelectric power also commenced with the [[Rubicon Hydroelectric Scheme]] to the north-east of Melbourne.
The first capital works to be carried out by the SECV was the development of the 50 MW [[Yallourn Power Station, Victoria|Yallourn Power Station]], briquette factory, and open-cut brown coal mine in the Latrobe Valley. Transmission of electricity to Melbourne began in 1924, a distance of 160km using a 132kV line. The SECV moved to 220kV in 1956 and 500kV in 1970. Expansion was also carried out at the [[Newport Power Station, Victoria|Newport Power Station]] which was fuelled by imported black coal and Yallourn briquettes. Work on hydroelectric power also commenced with the [[Rubicon Hydroelectric Scheme]] to the north-east of Melbourne.


Electricity pricing was set by the SECV and had different tariffs for towns of different size, dependent on the costs of providing the electricity supply. Country interests argued that this was unfair to rural consumers, and in June 1928 a conference of rural and regional councils demanded the government equalise tariffs, but was rejected by the Labor Government. Equalisation of tariffs was not brought in until 1965, and it was due to the SECV itself rather than a response to political pressures.<ref name=aehr />
Electricity pricing was set by the SECV and had different tariffs for towns of different size, dependent on the costs of providing the electricity supply. Country interests argued that this was unfair to rural consumers, and in June 1928 a conference of rural and regional councils demanded the government equalise tariffs, but was rejected by the Labor Government. Equalisation of tariffs was not brought in until 1965, and it was due to the SECV itself rather than a response to political pressures.<ref name=aehr />

Revision as of 21:51, 19 October 2017

SECV logo as used by the 1980s

The State Electricity Commission of Victoria (SECV, ECV or SEC) was a government monopolistic electricity generation, transmission, distribution and supply utility operating in Victoria, Australia, created in 1918. Control of the SECV was by a Board of Commissioners appointed by the Victorian Government.

Background

SECV shield as used from formation until the 1970s

When electricity generation first became practical, the main uses were lighting of public buildings, street lighting and later, electric trams. As a result, electricity generation and distribution tended to be carried out by municipalities, by private companies under franchise to the councils, or by joint private-public bodies.[1]

Prior to the establishment of SECV, electricity was generated and distributed by a number of private and municipal generator and distribution companies. The main municipal-owned power station in Victoria was opened in 1892 by the Melbourne City Council, which generated electricity from its Spencer Street Power Station for the city’s residents, as well as being a wholesale supplier to other municipal distributors. The main privately owned company was the Melbourne Electric Supply Company which was established in the 1880s and operated under franchise arrangements with a number of other municipal distributors. The company operated the Richmond and Geelong power stations. The final major generator of electricity was the Victorian Railways which operated the Newport Power Station, for the supply of electricity to Melbourne's suburban trains. These early generators all relied on a fuel supply provided by the strike prone black coal industry of New South Wales.

Victoria has large reserves of brown coal located in the Latrobe Valley, to the east of Melbourne. Brown coal has a low energy density due to the high moisture content and would have been uneconomic to transport to Melbourne. However, advances in electrical transmission technology allowed electricity to be generated near the fuel source and transmitted to the consumer.[1] Following an overseas tour in 1911, Herbert Reah Harper, engineer with the Melbourne City Council Electricity Supply Department, recognised the potential for Victorian brown coal, after seeing Germany's use, and recommended the establishment of a public utility on the lines of the Ontario Hydro Electricity. He was subsequently appointed to the Victorian Government Brown Coal Advisory Committee (chaired by Department of Mines director Hyman Herman), which reported in September 1917. It recommended the establishment of an Electricity Commission to develop the brown coal reserves, construct a power station and transmission lines. In December 1918, Parliament passed a bill to establish a Commission with both regulatory and investigative powers, including taking over the enforcement of the existing Electric Light and Power Act, which regulated all electricity generators and distributors.[2]

History

Formation

Sugarloaf Power Station, part of the Rubicon Scheme

The Victorian Electricity Commissioners were created in 1919 under the Electricity Commissioners Act 1918 and took over administration of the Electric Light and Power Act from the Public Works Department.[3] The Electricity Commissioners became the State Electricity Commission of Victoria (SECV) under the State Electricity Commission Act 1920.[4] Sir John Monash was both chairman and general manager and Harper was the first chief engineer, retiring in 1936.[5] Funds were also available to the SECV for the development of the works recommended in 1917. The legislation also gave the SECV the authority to decide whether rival organisations could be set up in competition to it, as well as the authority to take over existing private companies when their franchises expired. Between 1922 and 1953 the SECV acquired control of the following undertakings when their franchises expired:[3]

The SECV also took over a number of small municipal electricity distributors during the 1920s, and in the 1930s the Melbourne Electric Supply Company was acquired along with their street tramway operations. Despite these acquisitions, municipal controlled distribution companies known as Municipal Electricity Undertakings (MEUs) in the inner urban areas of Melbourne remained outside of SECV control until the privatisation of the industry in the 1990s.[1]

Expansion

The first capital works to be carried out by the SECV was the development of the 50 MW Yallourn Power Station, briquette factory, and open-cut brown coal mine in the Latrobe Valley. Transmission of electricity to Melbourne began in 1924, a distance of 160km using a 132kV line. The SECV moved to 220kV in 1956 and 500kV in 1970. Expansion was also carried out at the Newport Power Station which was fuelled by imported black coal and Yallourn briquettes. Work on hydroelectric power also commenced with the Rubicon Hydroelectric Scheme to the north-east of Melbourne.

Electricity pricing was set by the SECV and had different tariffs for towns of different size, dependent on the costs of providing the electricity supply. Country interests argued that this was unfair to rural consumers, and in June 1928 a conference of rural and regional councils demanded the government equalise tariffs, but was rejected by the Labor Government. Equalisation of tariffs was not brought in until 1965, and it was due to the SECV itself rather than a response to political pressures.[1]

Growth

Hazelwood Power Station
The modern Yallourn W plant
Newport Power Station in suburban Melbourne

During World War II construction and maintenance work had delayed, and after the war the SECV had difficulty with keeping up with increasing electricity demand. Existing thermal power stations were expanded at Yallourn and Newport, with much bigger generators of 50 MW capacity used, much larger than the 15-25 MW units used pre-war. The hydroelectric resources at Eildon and Kiewa also saw continued development. The Richmond Power Station was also converted to oil firing, and smaller 'prefabricated' power stations were erected in Geelong and Ballarat. These additions resulted in a reduction in the dependence on black coal by the 1950s.

By the 1960s the trend towards more efficient large capacity equipment continued, with additional generators of 120 MW capacity installed at Yallourn, and the Hazelwood Power Station with eight 200 MW units commissioned along with a new open cut mine and briquette factory. The Hazelwood mine was not as successful as planned as Morwell coal was unsuitable for making briquettes, resulting in coal needing to be railed from the Yallourn mine.

By the end of the decade brown coal was used to generate 90 per cent of Victoria's electricity supply, with all of the coal sourced from open cut mines under SECV control. As a result, the SECV was not forced to raise power costs during the 1970s oil price shocks, in contrast to other electricity suppliers around the world.[1]

Expansion in the Latrobe Valley continued though the 1970s with the Yallourn W plant replacing the older units and delivering much greater reliability with Japanese and German technology, compared to the previously utilised equipment from the UK. A new gas fuelled power station was also proposed in the early 1970s for Newport to replace existing plant, but met considerable opposition from nearby residents becoming the first major SECV project that met widespread opposition from the general public.[1] It was not opened until the 1980s and with only half the proposed capacity.

In the 1980s work on a third open cut commenced at Loy Yang, as the Yallourn and Morwell coal fields were both committed to fuel existing power stations. The plan was for two new stations (Loy Yang A and B) consisting all a total of eight 500 MW units, all fed by the common coal mine. The project was hit by cost overruns, with an independent review initiated by the government in late 1982, finding excessive rates of pay for construction and operation staff, poor project management, over investment in both the coal mine and power station and general overmanning.[1]

Electricity costs to consumers also begun to rise in the 1980s, due to the need to pay greater dividends to the Victorian Government and to service greater debt levels from the heavy expansion. The SECV was also a part to the Portland Smelter Contract, which provided the Alcoa aluminium smelter with favourable electricity prices at the expense of other consumers.[1]

Demise

In 1994, the Kennett government disaggregated the SECV into five distribution and retail companies (absorbing the MEUs in the process), five generation companies, and a transmission company. Along with other state-owned utilities (such as the Gas and Fuel Corporation of Victoria), these businesses were all corporatised, then privatised between 1995 and 1999.

The only entities remaining in State Government ownership were the wholesale market operator Victorian Power Exchange (VPX) and the SECV shell which holds indentures for debts owed to it by brown coal development company HRL Limited,[6] and pays Alcoa annual subsidies for its significant electricity needs.[7] VPX was subsequently reorganised with its market and system operation functions being transferred to the National Electricity Market Management Company (NEMMCO) and its transmission planning functions being transferred to VENCorp (now Australian Energy Markets Operator—AEMO).

Currently, the Essential Services Commission of Victoria is responsible for the regulation of retail electricity distributors, and the Australian Energy Regulator is responsible for regulating distribution, transmission and the wholesale electricity market. [8]

Successors

After privatisation, the retail electricity distribution companies were:

Other responsibilities

The company town of Yallourn

Other than electricity generation, the State Electricity Commission of Victoria also:

  • Built and managed the company town of Yallourn for workers of the accompanying power station.[10]
  • Produced briquettes at Yallourn and Morwell from brown coal.
  • Operated a 900mm gauge electric railway at Yallourn to convey coal from the open cut, later extended to Morwell and Hazelwood.[11]
  • Operated a dedicated fire and rescue service, known up to 1984 as the "SECV Fire Service", and post-1984 as "SECV Fire Rescue". The service comprised fully manned fire stations in the Yallourn, Morwell and Loy Yang production areas. Firefighting appliances consisted of Hino rear-mounted pumpers, Ford F350 Rescue tenders, 4wd 4000 litre capacity rural fire tankers, 4wd support vehicles and Volkswagen trailer-mounted pumps. One each of these vehicles were located at each station, along with a single RFW 6 wheel Telesqurt / 75 foot Ladder/boom aerial vehicle. SEC F&R staff provided fire fighting training to other SECV employees. Additional to routine firefighting skills, SECV F&R firefighters were trained in high-angle rescue techniques, industrial firefighting and high voltage operations.
  • Operated six diesel shunting locomotives identical to the Victorian Railways F class for shunting the Yallourn, Morwell and Newport Powerhouse rail sidings.[12]
  • Operated and expanded the three provincial electric tramways in Ballarat, Bendigo and Geelong, after taking over the previous electricity-generating companies (the ESCo (Electric Supply Company of Victoria Ltd) and MESC (Melbourne Electric Supply Company)).

See also

References

  1. ^ a b c d e f g h Malcolm Abbott (March 2006). "The performance of an electricity utility: the case of the State Electricity Commission of Victoria, 1925–93". Australian Economic History Review (Volume 46 Issue 1). Economic History Society of Australia and New Zealand. pp. Pages 23–44. doi:10.1111/j.1467-8446.2006.00150.x. Retrieved 25 July 2008.
  2. ^ Electricity Commissioners Act 1918 (No.2996)
  3. ^ a b Public Records Office: Agency VA 1002: State Electricity Commission of Victoria
  4. ^ State Electricity Commission Act 1920 (No.3104)
  5. ^ SEC Magazine, Sept 1936
  6. ^ Australian Financial Review 7 July 2011 "HRL keeps $390m in Victorian government deal"
  7. ^ http://www.audit.vic.gov.au/reports_and_publications/latest_reports/2011-12/20111109-afr.aspx on pages 47-48
  8. ^ http://www.aemo.com.au/
  9. ^ GPU REACHES TENTATIVE AGREEMENT FOR SOLARIS POWER SALE
  10. ^ Meredith Fletcher (2001). "The house with two lives". Our house: histories of Australian homes. Australian Heritage Commission. Retrieved 25 July 2008.
  11. ^ John Cleverdon. "SECV Electric Locomotives". Locopage. Retrieved 21 February 2008.
  12. ^ "Victorian Goldfields Railway". www.vgr.com.au. Retrieved 25 July 2008.

Further reading

  • Edwards, Cecil (1969). Brown Power. A jubilee history of the SECV. State Electricity Commission of Victoria.
  • Gill, Herman (1949). Three Decades: The story of the State Electricity Commission of Victoria from its inception to December 1948. Hutchinson & Co.