In 1965, the PAEC entered with agreement with [[Canadian General Electric| General Electric]] to supply the country's [[Karachi Nuclear Power Plant|first nuclear power plant]]. [[Ministry of Science and Technology (Pakistan)#Science Advisor|Science Adviser]] to the President, dr. [[Abdus Salam]] traveled to [[United States]] where he successfully signed an agreement with [[General Electric]] to provide country's [[Karachi Nuclear Power Plant|first nuclear power plant]] in Karachi. He also closed an agreement with the [[Government of United States]] to provide [[Plutonium]] [[Pakistan Atomic Research Reactor|research reactor]] in [[Rawalpindi]]. It was Salam's effort that [[Edward Durell Stone]] designed and the led contruction of a [[Pakistan Institute of Nuclear Science and Technology|nuclear research institute]] in Nilore.
In 1965, the PAEC entered with agreement with [[Canadian General Electric| General Electric]] to supply the country's [[Karachi Nuclear Power Plant|first nuclear power plant]]. [[Ministry of Science and Technology (Pakistan)#Science Advisor|Science Adviser]] to the President, dr. [[Abdus Salam]] traveled to [[United States]] where he successfully signed an agreement with [[General Electric]] to provide country's [[Karachi Nuclear Power Plant|first nuclear power plant]] in Karachi. He also closed an agreement with the [[Government of United States]] to provide [[Plutonium]] [[Pakistan Atomic Research Reactor|research reactor]] in [[Rawalpindi]]. It was Salam's effort that [[Edward Durell Stone]] designed and the led contruction of a [[Pakistan Institute of Nuclear Science and Technology|nuclear research institute]] in Nilore.


Following the [[Indo-Pakistani War of 1971|Indo-Pak 1971 ''Winter War'']], the PAEC came under the direct control of [[Prime minister of Pakistan|Prime minister]] [[Zulfikar Ali Bhutto]]. In January 1972, the commission was transferred from the Science and Technology Research Division to the [[Prime Minister of Pakistan|Prime minister's Secretariat]]. Bhutto immediately replaced [[I. H. Usmani]] with [[Munir Ahmad Khan]], [[International Atomic Energy Agency|IAEA]] scientist. With the appointment of Khan, Bhutto orchestrated the [[Project-706|development of nuclear weapons program]]. The PAEC led the groundbreaking work in the development of the atomic weapons which were developed under the administration of Munir Ahmad Khan. Munir Ahmad Khan multiple directorates mandate to developed the weapons.
Following the [[Indo-Pakistani War of 1971|Indo-Pak 1971 ''Winter War'']], the PAEC came under the direct control of [[Prime minister of Pakistan|Prime minister]] [[Zulfikar Ali Bhutto]]. In January 1972, the commission was transferred from the Science and Technology Research Division to the [[Prime Minister of Pakistan|Prime minister's Secretariat]]. Bhutto immediately replaced [[I. H. Usmani]] with [[Munir Ahmad Khan]], [[International Atomic Energy Agency|IAEA]] scientist. With the appointment of Khan, Bhutto orchestrated the [[Project-706|development of nuclear weapons program]]. The PAEC led the groundbreaking work in the development of the atomic weapons which were developed under the administration of Munir Ahmad Khan. Munir Ahmad Khan multiple loboratories, facilities and directorates mandate to developed the weapons. The PAEC also ran its seperate [[Nuclear power in Pakistan|nuclear power program]] and contributed in the electricity generation demands in Karachi. Under Khan, Pakistan and China signed a joint venture to peaceful use of nuclear energy in 1989. In 1991, Khan also led Pakistan in China where both country signed an agreement to provide the 300[[Mega watt|MW]] nuclear power plant in Chasma.


===Research and Education===
===Research and Education===

Revision as of 07:12, 6 February 2011

Pakistan Atomic Energy Commission (PAEC)
ادارہ جوہری توانائی پاکستان
File:Paec logo.jpg
Agency overview
FormedMarch 1956
Preceding agencies
  • Atomic Energy Commission Parliamentary Act of 1956
  • (etc.)
Superseding agency
JurisdictionPakistan's Federal Government
HeadquartersIslamabad, Islamabad Capital Territory
EmployeesHighly Classified
Annual budgetHighly Classified
Minister responsible
  • (etc.)
Agency executive
Child agencies
  • (etc.)
Key document
  • (etc.)
Websitewww.paec.gov.pk/ PAEC homepage
Footnotes
Note: PAEC is an autonomous agency that is free from jurisdiction of any ministry of Pakistan. It directly reported to Pakistan's Prime Minister Secretariat.

Pakistan Atomic Energy Commission (PAEC) (Urdu: ادارہ جوہری توانائی پاکستان) is a civilian-controlled autonomous scientific agency of Pakistan who is responsible for nuclear applications and development in Pakistan. The PAEC was established by a Parliamentary act of 1956 under the Government of Prime Minister of Pakistan, Huseyn Shaheed Suhrawardy.

The primary purpose of PAEC is to control the peace time development of atomic/nuclear science and technology. PAEC is an independent and autonmous scientific agency of Pakistan which is responsible country's civilian and military nuclear program. However, after the creation of National Command Authority, control over the Pakistan's nuclear weapons program was transferred over to National Command Authority, headed by Yousaf Raza Gillani, currently Prime Minister.[citation needed]

History

The history of Pakistan Atomic Energy Commission goes back to 1956, when the Atomic Energy Research Council was established. The same year, President Dwight Eisenhower announced the Atoms for Peace Program initiatives, Pakistan was among one of the first country to sign on (following Israel and Turkey), and signed a peaceful use of nuclear energy cooperation agreement with the United States. Under the Parliamentary act, Government of Pakistan established the Atomic agency to promote science research throughout the country. Its first chairman was Nazi Ahmad, a renowned experimental physicist, and the first Technical member was dr. Salimuzzaman Siddiqui who laid the foundation of Chemical laboratories in the Agency. In 1960, the PAEC made the proposal to chairman of Pakistan Industrial Development Corporation (PIDC) for the construction of a Heavy water reactor with production capacity of 50 kg of heavy water per day at Multan. However, the PIDC did not immediately act on the PAEC's proposal. However, Dr. Nazir Ahmad was immediately given a transfer to Federal Bureau of Statistics by the Field Marshal Ayub Khan. Dr. Ishrat Hussain Usmani, a bureaucrat, was made the agency's second chairman.

In 1965, the PAEC entered with agreement with General Electric to supply the country's first nuclear power plant. Science Adviser to the President, dr. Abdus Salam traveled to United States where he successfully signed an agreement with General Electric to provide country's first nuclear power plant in Karachi. He also closed an agreement with the Government of United States to provide Plutonium research reactor in Rawalpindi. It was Salam's effort that Edward Durell Stone designed and the led contruction of a nuclear research institute in Nilore.

Following the Indo-Pak 1971 Winter War, the PAEC came under the direct control of Prime minister Zulfikar Ali Bhutto. In January 1972, the commission was transferred from the Science and Technology Research Division to the Prime minister's Secretariat. Bhutto immediately replaced I. H. Usmani with Munir Ahmad Khan, IAEA scientist. With the appointment of Khan, Bhutto orchestrated the development of nuclear weapons program. The PAEC led the groundbreaking work in the development of the atomic weapons which were developed under the administration of Munir Ahmad Khan. Munir Ahmad Khan multiple loboratories, facilities and directorates mandate to developed the weapons. The PAEC also ran its seperate nuclear power program and contributed in the electricity generation demands in Karachi. Under Khan, Pakistan and China signed a joint venture to peaceful use of nuclear energy in 1989. In 1991, Khan also led Pakistan in China where both country signed an agreement to provide the 300MW nuclear power plant in Chasma.

Research and Education

In early 60s, PAEC established the research reactor and particle accelerator in East Pakistan and West Pakistan, where many scientist and engineers were trained. After the Bangladesh liberation war, a vast majority of scientist and engineers at Dhaka particle accelerator flew back to Pakistan.


PAEC is now the largest science and technology organization of the country, both in terms of scientific/technical manpower and the scope of its activities. Starting with a nuclear power reactor at Karachi (KANUPP) and an experimental research reactor at Nilore, Islamabad (PARR-I); a neutron particle accelerator at PARR-II, the emphasis in the early years remained focused on the peaceful uses of nuclear energy. Consequently research centres in: Agricultural engineering, nuclear engineering, nuclear medicine, nuclear technology, nuclear physics, nuclear chemistry, astrophysics, astrochemistry, astrobiology biochemistry, biophysics, biological sciences, biotechnology, theoretical physics mathematical physics, computational physics, experimental physics, geophysics and other scientific and mathematical disciplines were set up all over the country. As the emphasis shifted towards concerns for national security, important projects were also initiated in this area. PAEC is one of the most well known and oldest research institute in Pakistan, where country's most prominent scientist have worked, including Pakistani Nobel laureate, Dr. Abdus Salam (late), Dr. Ishfaq Ahmad, Mr. Munir Ahmad Khan and many other Pakistani scientists.

Expansion of Nuclear Power Plants

PAEC envisions setting up power plants with a capacity of 8800 MW by the year 2030. In this context CHASHNUPP project was initiated in the early 1990s, with the aim of establishing a complex of 4 units each having a 325 MW reactor. Expansion plans for KANNUP have also been launched. By 2008, studies were being conducted to identify new sites for further nuclear plants.

PAEC's Contribution to CERN

Pakistan has a long history of participating with CERN and has a long tradition of wonderful physicists who are working around the world. Pakistan has been contributing and regularly participating in CERN's project, nuclear experiments, etc. A prime example would be Dr. Abdus Salam; dr. Salam was the first man to be accredited with all the collaboration with CERN which continues till to date[when?] when he convinced CERN to give Pakistan stacks of nuclear emulsion exposed for further study of pions, kaons and antiprotons in 1960s[1]. Some theoretical physicists from Pakistan had the opportunity to work at CERN through short visits. During the 1980s, some of the experimental physicists from Pakistan, specializing in the technique of Solid State Nuclear Track Detectors (SSNTD), also benefited from CERN by exposing the stacks in the beam at the Super Proton Synchrotron (SPS)[2].

PAEC Contribution to Compact Muon Solenoid

In 1997, a well-known Pakistani nuclear physicist Dr. Ishfaq Ahmad was able to sign a contract between PAEC and CERN after elaborate discussions an in-kind contribution worth one million Swiss francs for the construction of eight magnet supports for the CMS detector[1].

PAEC Support to Large Hadron Collider

In 2000, CERN signed another agreement which doubled the Pakistani contribution from one to two million Swiss francs. And with this new agreement Pakistan started construction of the resistive plate chambers required for the CMS muon system. While more recently, a protocol has been signed enhancing Pakistan’s total contribution to the LHC programme to $10 million. Pakistan with all these efforts is already hoping to become an observer state at CERN[1][2]. In 2006 PAEC and CERN agreed on expanded cooperation, including contributions by PAEC valued at 5 million Swiss francs.[3]

World's Largest Energy Experiment at CERN

On 10 September 2008, PAEC, along with the Universities of Pakistan, send a large team of physicists and engineers to CERN. Pakistani scientists were heavily involved and participated in Large Hadron Collider, the world's largest and highest-energy particle accelerator[4].

Composition

The Commission consists of the following members appointed by the Federal Government namely:-

Full-Time members

  • a) Chairman
  • b) A Finance member, being representative of the Ministry of Finance, Government of Pakistan.
  • c) Technical members of whom one may be a member for Administration.

Part-Time members

  • a) A scientist in the service of the Federal Government of any organization setup by the Federal Government.
  • b) Two scientists.
  • c) Chief Scientific Adviser to the President, ex-officio.

The Commission meets not less than four times every year, and it has the mandate to take decisions on all matters, including research work, promotion of peaceful uses of atomic energy in the fields of agriculture, medicine and industry and for the execution of development projects involving nuclear power stations and the generation of electric power.

PAEC Chairmen

Numbers Name Term Start Term End Alma Mater Field Educational Background
1 Dr. Nazir Ahmed 11 March 1956 21 May 1960 University of Manchester, United Kingdom Experimental Physics Doctor of Philosophy (Ph.D)
2 Ishrat Hussain Usmani 15 July 1960 10 January 1972 Imperial College of Science and Technology, United Kingdom Atomic Physics Doctor of Philosophy (Ph.D)
3 Munir Ahmad Khan 20 January 1972 20 March 1991 Argonne National Laboratory, United States Nuclear Engineering Master of Science (M.Sc.)
4 Ishfaq Ahmad 13 March 1991 19 December 2001 Université de Montréal and Montreal Laboratory, Canada Nuclear Physics Doctor of Science (D.Sc.)
5 Parvez Butt 29 December 2001 5 April 2006 University of Toronto, Canada Nuclear Engineering Master of Science (M.Sc.)
6 Anwar Ali 1 May 2006 31 March 2009 Nuclear Technology Education Consortium, United Kingdom Nuclear Physics Master of Science (M.Sc.)
7 Ansar Pervaiz 7 April 2009 Present Rensselaer Polytechnic Institute, United States Nuclear Reactor Technology Doctor of Philosophy (Ph.D)

Current Full-Time members

Name Designation Role
Dr. Ansar Pervez Chairman, Pakistan Atomic Energy Commission Chairman
Mr.Muhammad Naeem Member, PAEC Next Chairman
Mr.Ghulam Nabi Member, PAEC Member (Technical)
Mr.Zia-ul-Hasan Siddique Member, PAEC Member (Power)
Mr.Mansoor Ali Sheikh Finance Secretary, Ministry of Finance (Pakistan) Member (Finance), PAEC
Dr. Abdul Rashid Member, PAEC Member (Bio-science)
Mr.Waqar Murtaza Butt Member, PAEC Member (Engineering)
Syed Shahid Mukhtar Member, PAEC Member (Administration)
Dr. Badar Suleman (PAEC) Member, PAEC Member (Physical Science)

Functions

  • Programmes to develop nuclear power and fuel-cycle facilities.
  • Promotion of use of radiation and radio-isotopes in agriculture, medicine and industry.
  • Research, development and training of manpower to support the programmes of nuclear power and radio-isotope applications.

Nuclear Power Programme

The task of nuclear power is divided between the Nuclear Power Generation and Nuclear Power Projects Divisions. The former overlooks the operational units while the latter is concerned with design and construction of planned units.

Projects

CHASHNUPP

  • 4 x 325 MW Units
  • CHASCENT Full Scope Training Simulator

Operational Units

  • CHASHNUPP 1

Planned Units

  • CHASNUPP 2,3,4

KANUPP

  • 1 x 125 MW
  • 2 x 325 MW

Operational Units

  • KANUPP 1

Planned Units

  • KANUPP 2,3,4,5