Vasai Creek Railway Bridge: Difference between revisions
Shyamsunder (talk | contribs) |
m Normalize {{Multiple issues}}: Remove {{Multiple issues}} for only 1 maintenance template(s): Refimprove |
||
Line 1: | Line 1: | ||
{{Use dmy dates|date=July 2017}} |
{{Use dmy dates|date=July 2017}} |
||
{{Use Indian English|date=July 2017}} |
{{Use Indian English|date=July 2017}} |
||
{{Multiple issues| |
|||
{{Orphan|date=February 2017}} |
{{Orphan|date=February 2017}} |
||
{{refimprove|date=November 2014}} |
{{refimprove|date=November 2014}} |
||
}} |
|||
The '''Naigaon railway over bridge''' is a proposed railway over bridge to connect [[Juchandra]] and [[Naigaon Railway station]] over the [[Sopara Creek]]. The proposal has been passed for the required approvals since 2010,<ref> |
The '''Naigaon railway over bridge''' is a proposed railway over bridge to connect [[Juchandra]] and [[Naigaon Railway station]] over the [[Sopara Creek]]. The proposal has been passed for the required approvals since 2010,<ref> |
Revision as of 19:13, 31 May 2020
This article needs additional citations for verification. (November 2014) |
The Naigaon railway over bridge is a proposed railway over bridge to connect Juchandra and Naigaon Railway station over the Sopara Creek. The proposal has been passed for the required approvals since 2010,[1][2] but the 2014 elections have brought about a political realignment that will allow for the required approvals.
The bridge, with an estimated budget of ₨108 crore, will span 1.2 kilometres (0.75 mi) with a width of 12 metres (39 ft). The bridge is expected to aid in local commutation as well as in the transport of fish, a major area industry. As of November 2014[update], no deadline had been announced for the completion of the bridge, although it is expected to require two to three years.
The Bahujan Vikas Aghadi has already inaugurated the event on 9 Nov2014 at the local rickshaw stand by felicitating the local bodies who have contributed by means of sharing their land for this project.
References
- ^ "Naigaon railway over bridge yet to get green light". DNA. 11 March 2012.
- ^ "Railway over bridge in Naigaon to be built soon". Naigaon news. 18 January 2016.