NTPL Thermal Power Station: Difference between revisions
Content deleted Content added
→top: added wikilink |
Rescuing 1 sources and tagging 0 as dead. #IABot (v1.6.2) |
||
Line 32: | Line 32: | ||
}} |
}} |
||
'''NTPL Thermal Power Station''' is a 1000 MW (2×500 MW) coal based thermal plant located in the [[Tuticorin District]] of Tamil Nadu. The project is a joint venture of [[Tamil Nadu Generation and Distribution Corporation|TANGEDCO]] and [[NLC India Limited]].The units were commissioned in March and April 2015, respectively.<ref>[http://www.cea.nic.in/reports/proj_mon/broad_status.pdf Broad Status Report,] India Central Electrical Authority, February 2015</ref><ref>[http://www.deccanherald.com/content/44592/hanakon-plant-shifted-tuticorin.html "It is a victory for people of Uttara Kannada district: Hanakon plant shifted to Tuticorin"], ''Deccan Herald'', January 2, 2010.</ref> |
'''NTPL Thermal Power Station''' is a 1000 MW (2×500 MW) coal based thermal plant located in the [[Tuticorin District]] of Tamil Nadu. The project is a joint venture of [[Tamil Nadu Generation and Distribution Corporation|TANGEDCO]] and [[NLC India Limited]].The units were commissioned in March and April 2015, respectively.<ref>[http://www.cea.nic.in/reports/proj_mon/broad_status.pdf Broad Status Report,] {{webarchive|url=https://web.archive.org/web/20120510153550/http://cea.nic.in/reports/proj_mon/broad_status.pdf |date=2012-05-10 }} India Central Electrical Authority, February 2015</ref><ref>[http://www.deccanherald.com/content/44592/hanakon-plant-shifted-tuticorin.html "It is a victory for people of Uttara Kannada district: Hanakon plant shifted to Tuticorin"], ''Deccan Herald'', January 2, 2010.</ref> |
||
==References== |
==References== |
Revision as of 01:26, 11 February 2018
NTPL Thermal Power Station | |
---|---|
Country | India |
Location | Harbour Estate, Thoothukudi, Tamil Nadu |
Coordinates | 8°45′32″N 78°10′54.8″E / 8.75889°N 78.181889°E |
Status | Operational |
Commission date | Unit 1: March 2012 Unit 2: August 2012 |
Owner(s) | |
Operator(s) | TANGEDCO,NLC India Limited |
Thermal power station | |
Primary fuel | Coal |
Power generation | |
Units operational | 2 X 500 MW |
Nameplate capacity | 1000 MW |
External links | |
Website | www |
NTPL Thermal Power Station is a 1000 MW (2×500 MW) coal based thermal plant located in the Tuticorin District of Tamil Nadu. The project is a joint venture of TANGEDCO and NLC India Limited.The units were commissioned in March and April 2015, respectively.[1][2]
References
- ^ Broad Status Report, Archived 2012-05-10 at the Wayback Machine India Central Electrical Authority, February 2015
- ^ "It is a victory for people of Uttara Kannada district: Hanakon plant shifted to Tuticorin", Deccan Herald, January 2, 2010.