MARC Train: Difference between revisions

Route map:
From Wikipedia, the free encyclopedia
Content deleted Content added
Cite error - ref name "Dilts" defined multiple times - Fixed
Rescuing 3 sources and tagging 1 as dead. #IABot (v1.6.1)
Line 48: Line 48:
===Penn Line===
===Penn Line===
{{Main article|Penn Line}}
{{Main article|Penn Line}}
The '''Penn Line''' runs about {{convert|77|mi}} between Washington, D.C., and [[Perryville, Maryland]], via [[Baltimore Penn Station]] over Amtrak's [[Northeast Corridor]] and Washington Terminal District. It is purported to be the fastest commuter rail line in North America, with trains of bi-level cars and electric locomotives capable of operating at speeds up to {{convert|125|mph}}.<ref name="trains.com">{{cite web|url=http://www.trains.com/trn/default.aspx?c=a&id=398|title=Maryland Rail Commuter (MARC)|author=Matt Van Hatten|date=June 30, 2006|work=Trains Magazine|accessdate=February 16, 2010}}</ref>{{dead link|date=December 2017}} The service was initially operated by the [[Pennsylvania Railroad]] (hence the name) and is the busiest line, carrying more passengers than the other two lines combined. The Penn Line is the only line that operates on weekends.
The '''Penn Line''' runs about {{convert|77|mi}} between Washington, D.C., and [[Perryville, Maryland]], via [[Baltimore Penn Station]] over Amtrak's [[Northeast Corridor]] and Washington Terminal District. It is purported to be the fastest commuter rail line in North America, with trains of bi-level cars and electric locomotives capable of operating at speeds up to {{convert|125|mph}}.<ref name="trains.com">{{cite web|url=http://www.trains.com/trn/default.aspx?c=a&id=398|title=Maryland Rail Commuter (MARC)|author=Matt Van Hatten|date=June 30, 2006|work=Trains Magazine|accessdate=February 16, 2010|deadurl=yes|archiveurl=https://web.archive.org/web/20081204135147/http://www.trains.com/trn/default.aspx?c=a&id=398|archivedate=December 4, 2008|df=mdy-all}}</ref> The service was initially operated by the [[Pennsylvania Railroad]] (hence the name) and is the busiest line, carrying more passengers than the other two lines combined. The Penn Line is the only line that operates on weekends.


;Special Western Maryland service
;Special Western Maryland service
Line 94: Line 94:
Controversy first arose when the French-owned and [[Montgomery County, Maryland]]-based [[Keolis]] (already operating [[Virginia Railway Express]] trains) was the only bidder for the contract. The bidding process was suspended in the fall of 2010 due to lack of competition. Before bidding reopened in 2011, Maryland passed a law (at the request of Leo Bretholz and other [[Holocaust]] survivors) requiring Keolis's majority owner, [[SNCF]] (currently solely owned by the French government)<ref>{{cite news| url=https://www.washingtonpost.com/wp-dyn/content/article/2010/07/06/AR2010070605169_2.html?sid=ST2010070605786 | work=The Washington Post | first=Katherine | last=Shaver | title=Holocaust group faults VRE contract | date=July 7, 2010}}</ref> to fully disclose its role in transporting Jews to concentration camps during [[World War II]] (while SNCF was under control of the Nazi government), to the satisfaction of the Maryland state archivist, before Keolis would be allowed to place a bid for MARC service. Keolis faced similar issues while bidding for VRE operations in 2009, but in the end, they were allowed to run VRE.
Controversy first arose when the French-owned and [[Montgomery County, Maryland]]-based [[Keolis]] (already operating [[Virginia Railway Express]] trains) was the only bidder for the contract. The bidding process was suspended in the fall of 2010 due to lack of competition. Before bidding reopened in 2011, Maryland passed a law (at the request of Leo Bretholz and other [[Holocaust]] survivors) requiring Keolis's majority owner, [[SNCF]] (currently solely owned by the French government)<ref>{{cite news| url=https://www.washingtonpost.com/wp-dyn/content/article/2010/07/06/AR2010070605169_2.html?sid=ST2010070605786 | work=The Washington Post | first=Katherine | last=Shaver | title=Holocaust group faults VRE contract | date=July 7, 2010}}</ref> to fully disclose its role in transporting Jews to concentration camps during [[World War II]] (while SNCF was under control of the Nazi government), to the satisfaction of the Maryland state archivist, before Keolis would be allowed to place a bid for MARC service. Keolis faced similar issues while bidding for VRE operations in 2009, but in the end, they were allowed to run VRE.


Keolis and SNCF lawyers claim that the all documentation required by the law had been produced long before.<ref>{{cite web|url=http://www.wbaltv.com/politics/27069604/detail.html |title=No way to run a railroad |publisher=WBAL TV |date=March 3, 2011 |accessdate=September 1, 2012}}</ref> This was also asserted by Don Phillips in the July 2011 issue of ''[[Trains Magazine]]''. Phillips states that a full 914 page independent report and complete history of SNCF's role in the Holocaust, released in 1996, is currently being translated into English.<ref>Phillips, Don. "Lawsuits, Commuter Trains and the Holocaust." Trains July 2011: P. 11.</ref> Phillips cites from the publicly available English introduction to the report, noting that while some SNCF workers worked with the Nazis, acts of sabotage were frequent, and the Nazis shot 819 SNCF workers for refusing to carry out the rail orders of the government. An additional 1200 railway workers were themselves sent to concentration camps over SNCF rails. Phillips also notes that SNCF does business with the [[Israel Railways|Israel rail system]] and works without government prompting to educate the current generation about the war and Holocaust.
Keolis and SNCF lawyers claim that the all documentation required by the law had been produced long before.<ref>{{cite web |url=http://www.wbaltv.com/politics/27069604/detail.html |title=No way to run a railroad |publisher=WBAL TV |date=March 3, 2011 |accessdate=September 1, 2012 }}{{dead link|date=January 2018 |bot=InternetArchiveBot |fix-attempted=yes }}</ref> This was also asserted by Don Phillips in the July 2011 issue of ''[[Trains Magazine]]''. Phillips states that a full 914 page independent report and complete history of SNCF's role in the Holocaust, released in 1996, is currently being translated into English.<ref>Phillips, Don. "Lawsuits, Commuter Trains and the Holocaust." Trains July 2011: P. 11.</ref> Phillips cites from the publicly available English introduction to the report, noting that while some SNCF workers worked with the Nazis, acts of sabotage were frequent, and the Nazis shot 819 SNCF workers for refusing to carry out the rail orders of the government. An additional 1200 railway workers were themselves sent to concentration camps over SNCF rails. Phillips also notes that SNCF does business with the [[Israel Railways|Israel rail system]] and works without government prompting to educate the current generation about the war and Holocaust.


As of June 2011, the future of Keolis's ability to bid on the MARC contract remained up in the air with the new disclosure law in place. No other bidder had emerged to replace CSXT. On June 5, 2011, ''[[The Washington Post]]'' ran an editorial critical of the disclosure law. The Post claimed that SNCF has been working for years on digitizing its records, and the Maryland law may require items or formats counter to SNCF's current system and/or French law. The Post also reported that some in the Maryland Attorney General's Office worried the law was not Constitutional, may risk retaliation towards Maryland firms overseas, and may risk federal funding for Maryland "by imposing arbitrary procurement demands on a single company."<ref>{{cite news| url=https://www.washingtonpost.com/opinions/no-way-to-run-a-railroad/2011/06/03/AGk2gmJH_story.html |title=No way to run a railroad | work=The Washington Post | first=Michael | last=Lind | date=June 5, 2011}}</ref><ref>{{cite news|url=http://www.jewishtimes.com/index.php/jewishtimes/news/jt/local_news/state_archivist_sncf_archives_might_not_be_enough/29884|title=State archivist SNCF archives might not be enough |work=Baltimore Jewish Times| first=Neil | last=Rubin | date=February 10, 2012}}</ref>
As of June 2011, the future of Keolis's ability to bid on the MARC contract remained up in the air with the new disclosure law in place. No other bidder had emerged to replace CSXT. On June 5, 2011, ''[[The Washington Post]]'' ran an editorial critical of the disclosure law. The Post claimed that SNCF has been working for years on digitizing its records, and the Maryland law may require items or formats counter to SNCF's current system and/or French law. The Post also reported that some in the Maryland Attorney General's Office worried the law was not Constitutional, may risk retaliation towards Maryland firms overseas, and may risk federal funding for Maryland "by imposing arbitrary procurement demands on a single company."<ref>{{cite news| url=https://www.washingtonpost.com/opinions/no-way-to-run-a-railroad/2011/06/03/AGk2gmJH_story.html |title=No way to run a railroad | work=The Washington Post | first=Michael | last=Lind | date=June 5, 2011}}</ref><ref>{{cite news|url=http://www.jewishtimes.com/index.php/jewishtimes/news/jt/local_news/state_archivist_sncf_archives_might_not_be_enough/29884|title=State archivist SNCF archives might not be enough |work=Baltimore Jewish Times| first=Neil | last=Rubin | date=February 10, 2012}}</ref>
Line 135: Line 135:
The HHP-8 is restricted to the [[Railway electrification system|electrified]] Penn Line.
The HHP-8 is restricted to the [[Railway electrification system|electrified]] Penn Line.


In early 2008, MARC placed an order for 26 new [[MPI MPXpress|MPI MP36PH-3C]] diesel locomotives, which replaced all 19 of the 70s-era GP40WH-2 units. They began arriving in November 2008.<ref>{{cite web |url=http://www.mtamaryland.com/services/marc/serviceInformation/On_Your_MARC_Text.cfm |title=MTA Expands MARC Penn Line Service |publisher=MTA Maryland Service Information |accessdate=February 16, 2010}}</ref> All are in service as of March 2011; however, MARC still uses a single GP40WH-2 unit occasionally as a need arises, such as when an Amtrak or MARC locomotive malfunctions.
In early 2008, MARC placed an order for 26 new [[MPI MPXpress|MPI MP36PH-3C]] diesel locomotives, which replaced all 19 of the 70s-era GP40WH-2 units. They began arriving in November 2008.<ref>{{cite web |url=http://www.mtamaryland.com/services/marc/serviceInformation/On_Your_MARC_Text.cfm |title=MTA Expands MARC Penn Line Service |publisher=MTA Maryland Service Information |accessdate=February 16, 2010 |deadurl=yes |archiveurl=https://web.archive.org/web/20090331152834/http://www.mtamaryland.com/services/marc/serviceInformation/On_Your_MARC_Text.cfm |archivedate=March 31, 2009 |df=mdy-all }}</ref> All are in service as of March 2011; however, MARC still uses a single GP40WH-2 unit occasionally as a need arises, such as when an Amtrak or MARC locomotive malfunctions.


In September 2015, the [[Maryland Board of Public Works]] approved a $58.1 million contract to purchase eight [[Siemens Charger]] diesel locomotives. The purchase was made off an existing order placed by the Illinois Department of Transportation, offering cost savings over a MARC-only order.<ref>{{cite news|last1=Dresser|first1=Michael|title=MTA seeks $58 million for new MARC engines|url=http://www.baltimoresun.com/news/maryland/bs-md-marc-locomotives-20150807-story.html|accessdate=August 10, 2015|work=The Baltimore Sun|date=August 8, 2015}}</ref><ref>{{cite web | url=http://www.railwayage.com/index.php/mechanical/locomotives/maryland-board-of-public-works-approves-contract-for-marc-locomotives.html | title=Maryland Board of Public Works approves contract for MARC locomotives | publisher=Railway Age | date=September 18, 2015 | accessdate=September 22, 2015}}</ref> The first Charger will be delivered in December 2017 and tested prior to entering revenue service in February 2018. Deliveries will continue through April 2018.<ref name="marc-advisory-council-september-2017" />
In September 2015, the [[Maryland Board of Public Works]] approved a $58.1 million contract to purchase eight [[Siemens Charger]] diesel locomotives. The purchase was made off an existing order placed by the Illinois Department of Transportation, offering cost savings over a MARC-only order.<ref>{{cite news|last1=Dresser|first1=Michael|title=MTA seeks $58 million for new MARC engines|url=http://www.baltimoresun.com/news/maryland/bs-md-marc-locomotives-20150807-story.html|accessdate=August 10, 2015|work=The Baltimore Sun|date=August 8, 2015}}</ref><ref>{{cite web | url=http://www.railwayage.com/index.php/mechanical/locomotives/maryland-board-of-public-works-approves-contract-for-marc-locomotives.html | title=Maryland Board of Public Works approves contract for MARC locomotives | publisher=Railway Age | date=September 18, 2015 | accessdate=September 22, 2015}}</ref> The first Charger will be delivered in December 2017 and tested prior to entering revenue service in February 2018. Deliveries will continue through April 2018.<ref name="marc-advisory-council-september-2017" />
Line 249: Line 249:
==Proposed service expansion==
==Proposed service expansion==


In the first decade of the 21st century ridership increased significantly, and the system neared capacity for its current configuration. With the area population growing and the [[Base Realignment and Closure|BRAC]] process poised to bring new jobs to [[Aberdeen Proving Ground]] and [[Fort George G. Meade|Ft. Meade]], both of which are served by nearby stations, the state saw the need to expand service to accommodate growth. In September 2007, MTA Maryland unveiled an ambitious 30-year plan of system improvements. Though funding sources had not been established at that time, the plan represented the state's goals of increasing capacity and flexibility. Proposed improvements included:<ref>{{cite web |url=http://www.mtamaryland.com/marc%20plan%20full.pdf |format=PDF |title=MARC Growth & Investment Plan |publisher=MTA Maryland |date=September 2007 |accessdate=February 16, 2010}}</ref>
In the first decade of the 21st century ridership increased significantly, and the system neared capacity for its current configuration. With the area population growing and the [[Base Realignment and Closure|BRAC]] process poised to bring new jobs to [[Aberdeen Proving Ground]] and [[Fort George G. Meade|Ft. Meade]], both of which are served by nearby stations, the state saw the need to expand service to accommodate growth. In September 2007, MTA Maryland unveiled an ambitious 30-year plan of system improvements. Though funding sources had not been established at that time, the plan represented the state's goals of increasing capacity and flexibility. Proposed improvements included:<ref>{{cite web |url=http://www.mtamaryland.com/marc%20plan%20full.pdf |format=PDF |title=MARC Growth & Investment Plan |publisher=MTA Maryland |date=September 2007 |accessdate=February 16, 2010 |deadurl=yes |archiveurl=https://web.archive.org/web/20090227000614/http://www.mtamaryland.com/marc%20plan%20full.pdf |archivedate=February 27, 2009 |df=mdy-all }}</ref>
*Acquisition of new equipment. 54 Bombardier MultiLevels were ordered to replace aging single-level cars.
*Acquisition of new equipment. 54 Bombardier MultiLevels were ordered to replace aging single-level cars.

Revision as of 13:04, 10 January 2018

Maryland Area Regional Commuter Rail
A MARC train on the Brunswick Line at Dickerson Station
A MARC train on the Brunswick Line at Dickerson Station
A MARC train with bi-levels on the Penn Line at BWI
A MARC train with bi-levels on the Penn Line at BWI
Overview
OwnerMaryland Transit Administration
LocaleBaltimore-Washington Metropolitan Area
Transit typeRegional/ commuter rail
Number of lines3
Number of stations42
Daily ridership40,100 (Q2 2016)[1]
Annual ridership9,149,900 (2015)[2]
Chief executiveAndrea Farmer
WebsiteMARC Train official page
Operation
Began operation1984; 40 years ago (1984) (as Maryland Rail Commuter)
Operator(s)Bombardier Transportation
(Camden and Brunswick)
Amtrak
(Penn)
(under contract to the Maryland Transit Administration)
Reporting marksMARC
Infrastructure manager(s)Amtrak
CSX Transportation
Technical
System length187 mi (301 km)
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
Electrification25Hz AC on the Penn Line
Top speed125 mph (201 km/h)

MARC (Maryland Area Regional Commuter) Train Service[3] (reporting mark MARC), known prior to 1984 as Maryland Rail Commuter, is a commuter rail system comprising three lines in the Baltimore-Washington Metropolitan Area. MARC is administered by the Maryland Transit Administration (MTA), a Maryland Department of Transportation (MDOT) agency, and is operated under contract by Bombardier Transportation Services USA Corporation (BTS) and Amtrak over tracks owned by CSX Transportation (CSXT) and Amtrak.

With some equipment capable of reaching speeds of 125 miles per hour (201 km/h), MARC is purported to be the fastest commuter railroad in the United States.[4]

Train lines

MARC operates 93 trains on a typical weekday over three separate lines of service: the Brunswick Line (18 trains/19 trains on Fridays),[5] the Camden Line (21 trains),[6] and the Penn Line (57 trains).[7] MARC added limited weekend service on the Penn Line on December 7, 2013.[8] Service is suspended or reduced on selected Federal holidays.

Brunswick Line

The Brunswick Line runs about 74 miles (119 km) from Washington, D.C., to Martinsburg, West Virginia, over the CSXT Metropolitan and Cumberland Subdivisions (both former Baltimore and Ohio Railroad (B&O) lines), and the Amtrak Washington Terminal District. The Brunswick Line service also includes a 14 miles (23 km) branch serving Frederick, which diverges from the Metropolitan Subdivision at East Rocks (just east of Point of Rocks) before traveling over the CSXT Old Main Line and the MDOT Frederick Branch.

Camden Line

The Camden Line runs about 39 miles (63 km) between Washington, D.C., and Camden Station in Baltimore over the CSXT Capital Subdivision and Amtrak Washington Terminal District. The B&O first began service over portions of this route in 1830, making it one of the oldest passenger rail lines in the U.S. still in operation.[9]

Penn Line

The Penn Line runs about 77 miles (124 km) between Washington, D.C., and Perryville, Maryland, via Baltimore Penn Station over Amtrak's Northeast Corridor and Washington Terminal District. It is purported to be the fastest commuter rail line in North America, with trains of bi-level cars and electric locomotives capable of operating at speeds up to 125 miles per hour (201 km/h).[10] The service was initially operated by the Pennsylvania Railroad (hence the name) and is the busiest line, carrying more passengers than the other two lines combined. The Penn Line is the only line that operates on weekends.

Special Western Maryland service

Trains have made special weekend trips to and from Cumberland, Maryland. Past events have included trains for Western Maryland residents to attend sporting events in the Baltimore/Washington area, such as Baltimore Orioles or Washington Redskins games, or for Baltimore/Washington residents to attend Railfest in Cumberland and enjoy the scenic mountains and fall foliage of Western Maryland.[11]

History

A MARC EMD F9 leads a service through Point of Rocks in 1987.

Origins

All three MARC lines date from the 19th century. Service on the Baltimore and Ohio Railroad (B&O) from Baltimore to Ellicott City began on May 24, 1830; this route included part of what is now the Camden Line.[12] B&O service from Baltimore to Washington, the modern Camden Line route, began on August 25, 1835.[9]

The B&O's main line was extended to Frederick Junction (with a branch to Frederick) in 1831, to Point of Rocks in 1832, to Brunswick and Harpers Ferry in 1834, and Martinsburg in 1842. The B&O completed its Metropolitan Branch in 1873; most service from Martinsburg and Frederick was diverted onto the Metropolitan Branch to Washington and the old main line became a secondary route. This established the basic route for what would become the Brunswick Line.

The Philadelphia, Wilmington and Baltimore Railroad (PW&B) completed its line between Baltimore and Philadelphia in December 1838, save for the ferry across the Susquehanna River, which was not bridged until the 1860s. Although the B&O was chartered with the unspoken assumption that no competing line would be built between Baltimore and Washington, the Pennsylvania Railroad-owned Baltimore and Potomac Railroad (B&P) was completed between the two cities in 1872.[13] The PW&B was initially hostile to the Pennsylvania (PRR); however, the PRR acquired it in a stock battle with the B&O in 1881. The PW&B soon began operating PRR through service - the ancestor of Penn Line service - between Washington and Philadelphia in conjunction with the B&P. Meanwhile, the PRR ended B&O trackage rights over the PW&B in 1884, forcing it to open its own parallel route in 1886. The PW&B and the B&P were combined into the PRR's Philadelphia, Baltimore and Washington Railroad in 1902.[14]

The B&O ended local service on the Frederick Branch in November 1949. All B&O passenger service between Baltimore and Philadelphia ended in 1958; local service from Washington was curtailed to Camden Station. The B&O continued to offer local service to Brunswick plus long-distance service, while the PRR operated a mix of local, intercity, and long-distance service on the Northeast Corridor. Local service north of Baltimore on the PRR ended around 1964.

Public takeover

A B&O train near the Beltway in 1970, running on what is now the Camden Line
A Penn Central train near the Beltway in 1970, running on what is now the Penn Line

Passenger rail service declined from a variety of factors (particularly the advent of the automobile) in the mid 20th century, even as commuting from suburban locations to urban business districts remained common. In 1968, the PRR folded into Penn Central, which took over its passenger operations.[15] On May 1, 1971, Amtrak took over most intercity passenger service in the United States, including some trains on the B&O and PRR.[16] The remaining Washington-Baltimore and Washington-Brunswick commuter service was operated by the B&O and Penn Central without subsidies.[17]

Amtrak initially operated (with federal subsidy) the Washington-Parkersburg West Virginian (later renamed Potomac Turbo then Potomac Special) and the Washington-Cincinnati Shenandoah over the B&O. The Potomac Special was cut back to a 73-mile (117 km) commuter-based Washington-Martinsburg trip, the Blue Ridge, on May 7, 1973. In early 1974, the B&O threatened to discontinue its remaining unsubsidized commuter services, citing heavy losses. On March 1, 1974, the Maryland Department of Transportation (MDOT) began a 50% subsidy of the B&O's Washington-Brunswick and Washington-Baltimore service - the first state-sponsored commuter rail service to Washington.[18][19] In 1975, the state signed an operating agreement with the B&O, under which the state provided rolling stock and reimbursed the railroad for all operating losses.[19] Later in the decade, West Virginia began to fund the B&O shuttles between Brunswick and Martinsburg; the shuttles were soon incorporated as extensions of Brunswick service in order to secure Urban Mass Transportation Administration subsidies.[20] In 1986, the Maryland State Railroad Administration (SRA) was established to administer contracts, procure rolling stock, and oversee short line railroads in the state.[19] In December 1981, MDOT purchased 22 ex-PRR coaches for use on B&O lines.[21]

Conrail took over the unsubsidized ex-PRR Baltimore-Washington service from Penn Central at its creation on April 1, 1976.[22] MDOT began subsidizing that service after Conrail threatened to discontinue service on April 1, 1977.[23] Prior to 1978, most ex-PRR Baltimore-Washington service was operated by aging MP54 electric multiple units, most dating back to the line's 1933 electrification. In 1978, Amtrak and the City of Baltimore negotiated with the New Jersey Department of Transportation to lease a number of new Arrow railcars to replace the MP54s.[24] With funding from Pennsylvania and Maryland, Amtrak used some of the cars to initiate a Philadelphia-Washington commuter trip, the Chesapeake, on April 30, 1978.[24] The Chesapeake stopped at some local stations but fewer than the Conrail service; it provided commuter service from north of Baltimore for the first time since the 1960s.

BWI Rail Station opened for Amtrak and Conrail trains on October 26, 1980.[25] In August 1982, Conrail trains began stopping at Capital Beltway station, used by intercity trains since 1970. Lanham and Landover stations were closed.[26] Two additional round trips - one in the peak direction, and one reverse for commuters working in Baltimore - were added on July 5, 1983.[27] On October 30, 1983, Amtrak and MARC moved from Capital Beltway into a new platform and waiting room at nearby New Carrollton station, served by Metro since 1978.[28][29][30]

In 1981, MDOT began installing highway signs to point drivers to commuter rail stations.[31] In 1982, law changes allowed Conrail to shed its commuter rail operations in order to focus on its more profitable freight operations. On January 1, 1983, public operators (including Metro-North Railroad, New Jersey Transit, and SEPTA Regional Rail) took over Conrail commuter rail systems in the Northeast. MDOT began paying Amtrak to run the ex-PRR Washington-Baltimore service.[19][21] On October 1983, with low patronage and largely duplicated by the MDOT-subsidized service, the Chesapeake was discontinued. In 1984, the SRA renamed its three subsidized lines as MARC (Maryland Rail Commuter) as a branding strategy. Operations remained the same, but public-facing elements like schedules and crew uniforms were consolidated under the new name.[19][21] MARC soon began calling its three lines the Penn Line, Camden Line, and Brunswick Line.

Improved service

MARC train led by an EMD E9 (former Burlington Northern) at Jessup in 1994

In October 1986, MARC began testing an Amtrak AEM-7 locomotive, looking to use push-pull trains to replace the Arrows.[21] On February 27, 1989, MARC increased Washington-Baltimore service from 7 to 13 weekday round trips. A new park-and-ride station opened at Bowie State (site of Jericho Park station, closed in 1981) and Bowie station was closed.[21] Two more round trips were added in May 1989.[21]

On May 1, 1991, MARC service was extended north from Baltimore to Perryville with intermediate stops at Martin State Airport, Edgewood, and Aberdeen.[32] Between 1988 and 1993, MARC expanded service from 34 to 70 total daily trips across the system.[33] In 1995, 800 parking spaces were added to Odenton station.[34]

From 1989 to 1996, the Camden Line had high ridership growth and substantial changes to its stations. A new station at Savage just off Route 32 was opened on July 31, 1989.[35] MARC began service to Greenbelt station in May 1993, seven months before Metro began serving the station.[36] On January 31, 1994, MARC expanded midday service on the Camden and Brunswick lines, opened Laurel Race Track station to relieve a parking shortage at Laurel station, and closed the underused Berwyn station on the Camden Line.[37] On December 12, 1994, Muirkirk station (originally planned as South Laurel) was opened to reduce congestion on nearby Route 1.[38] In 1996, a $1.2 million project added 600 parking spaces at Savage station to relieve crowding.[34] In July 1996, the Elkridge station was closed and replaced with Dorsey station, which has a larger parking area and a dedicated interchange with Route 100.[39][40]

On April 30, 1987, the B&O was merged into CSX. CSX continued to operate Camden and Brunswick Line service.[21] On July 6, 1987, MARC opened Metropolitan Grove station - the first new station on the Brunswick line in over a century.[41][42]

Contract controversy

Beginning as early as June 2010, MARC began looking for a new operator to replace CSX Transportation for the Camden and Brunswick Lines.[43]

Controversy first arose when the French-owned and Montgomery County, Maryland-based Keolis (already operating Virginia Railway Express trains) was the only bidder for the contract. The bidding process was suspended in the fall of 2010 due to lack of competition. Before bidding reopened in 2011, Maryland passed a law (at the request of Leo Bretholz and other Holocaust survivors) requiring Keolis's majority owner, SNCF (currently solely owned by the French government)[44] to fully disclose its role in transporting Jews to concentration camps during World War II (while SNCF was under control of the Nazi government), to the satisfaction of the Maryland state archivist, before Keolis would be allowed to place a bid for MARC service. Keolis faced similar issues while bidding for VRE operations in 2009, but in the end, they were allowed to run VRE.

Keolis and SNCF lawyers claim that the all documentation required by the law had been produced long before.[45] This was also asserted by Don Phillips in the July 2011 issue of Trains Magazine. Phillips states that a full 914 page independent report and complete history of SNCF's role in the Holocaust, released in 1996, is currently being translated into English.[46] Phillips cites from the publicly available English introduction to the report, noting that while some SNCF workers worked with the Nazis, acts of sabotage were frequent, and the Nazis shot 819 SNCF workers for refusing to carry out the rail orders of the government. An additional 1200 railway workers were themselves sent to concentration camps over SNCF rails. Phillips also notes that SNCF does business with the Israel rail system and works without government prompting to educate the current generation about the war and Holocaust.

As of June 2011, the future of Keolis's ability to bid on the MARC contract remained up in the air with the new disclosure law in place. No other bidder had emerged to replace CSXT. On June 5, 2011, The Washington Post ran an editorial critical of the disclosure law. The Post claimed that SNCF has been working for years on digitizing its records, and the Maryland law may require items or formats counter to SNCF's current system and/or French law. The Post also reported that some in the Maryland Attorney General's Office worried the law was not Constitutional, may risk retaliation towards Maryland firms overseas, and may risk federal funding for Maryland "by imposing arbitrary procurement demands on a single company."[47][48]

MTA issued a new Request for Proposals for the operations and maintenance of MARC services on the Brunswick and Camden Lines on July 14, 2011, with a deadline for proposals on November 21, 2011.[49] On October 17, 2012, a $204 million contract to run the CSXT lines was awarded to the Canadian company Bombardier Transportation,[50] effectively ending the Keolis controversy. The pre-service transition period began on the Thursday of that week, during which time CSXT continued to operate MARC trains.[50][51]

Equipment

Locomotives

MARC Locomotives
Manufacturer Model Quantity Unit Numbers Notes
Bombardier-Alstom HHP-8 6 4910–4915

Undergoing refurbishment; as of September 2017, first reconditioned unit has been delivered and is undergoing successful testing[52]

EMD GP39H-2 6 70–75
MPI MP36PH-3C 26 10–35

Replaced GP40s

EMD GP40WH-2 1 68

Former Locomotives

Retired MARC Locomotives
Manufacturer Model Quantity Unit Numbers Notes
EMD/ASEA AEM-7 4 4900–4903

Retired as of April 2017[53]

The HHP-8 is restricted to the electrified Penn Line.

In early 2008, MARC placed an order for 26 new MPI MP36PH-3C diesel locomotives, which replaced all 19 of the 70s-era GP40WH-2 units. They began arriving in November 2008.[54] All are in service as of March 2011; however, MARC still uses a single GP40WH-2 unit occasionally as a need arises, such as when an Amtrak or MARC locomotive malfunctions.

In September 2015, the Maryland Board of Public Works approved a $58.1 million contract to purchase eight Siemens Charger diesel locomotives. The purchase was made off an existing order placed by the Illinois Department of Transportation, offering cost savings over a MARC-only order.[55][56] The first Charger will be delivered in December 2017 and tested prior to entering revenue service in February 2018. Deliveries will continue through April 2018.[52]

Passenger cars

MARC Passenger Cars
Manufacturer / Model Photo Quantity Delivered Car Numbers Notes
Sumitomo/ Nippon Sharyo
MARC II
60

MARC IIA

  • 15 coaches
  • 11 cab cars
1985–1987 7700–7715
7745–7756
  • Single level cars.
  • 7709 and 7752 were destroyed in 1996 Silver Spring train collision.
  • 7711–14 were converted to "Bike Cars", equipped with 16 bike racks, left side, and 22 passenger seats on the right.
  • The remaining cars were retired in 2015, after being replaced by the Bombardier Multilevel cars.
  • From July 2016 until April 2017, some cars were leased to SEPTA Regional Rail to help increase capacity due to the Silverliner V Cars being taking out of service in July 2016 and all leased sets were pulled by Amtrak Siemens ACS-64's, while others still on MARC property remained in storage
  • During the summer of 2017, some coaches have been leased to Long Island Rail Road to allow their C3 cars to provide service on the Montauk Branch because of the usual high volume on that line during the summer.

MARC IIB

  • 28 coaches
  • 6 cab cars
1991–1993 7716–7735
7757–7762
7791–7799
  • Single level cars.
  • Entire MARC IIB fleet underwent minor overhaul 2009–2011 conducted by Bombardier.
  • 7720 was destroyed in 1996 Silver Spring train collision.
Kawasaki
MARC III
63
  • 49 coaches
  • 14 cab cars
1999–2001 7800–7834
7845–7858
7870–7876
7890–7896
  • Bilevel cars.
  • Scheduled to undergo minor overhaul by Bombardier.[57]
  • 7826–7834 and 7855–7858 are ex-VRE cars purchased used in 2008. They were first purchased by VRE in 2000 using an option for MARC's original MARC III order.
Bombardier
MARC IV
54
  • 39 coaches
  • 15 cab cars
2014 8000–8054
  • Bilevel cars marketed by Bombardier as "MultiLevels".
  • Delivery in June/July 2014.
  • Coaches entered service 2014-early 2015; first cab cars accepted for passenger service September 2016.

While many consists on all three lines are mixed with single- and bi-level cars, the majority of rush-hour trains on the Penn Line are composed mainly of Kawasaki bi-levels, while trains on the Brunswick Line and the Camden Line use more single levels (particularly for shorter 3–4 car trains). As of the entry of the Bombardier MARC IV coaches into service, rush-hour Penn Line trains are composed almost exclusively of MARC III bilevels. The Bombardier MARC IV "multilevel" cars and Sumitomo/Nippon Sharyo MARC IIB single level cars are used mostly on Brunswick and Camden Line trains, in addition to midday Penn Line trains. The Pullman gallery cars were operated only on Brunswick Line trains to Brunswick or Martinsburg due to their restriction to use at low-level platforms only.

Like most other commuter rail systems in North America, all trains are operated with a cab car from which the engineer can control the train. The cab car is typically at the head of trains traveling toward Washington to keep diesel fumes away from the terminal. To accommodate elevation gains, the locomotive is at the head of trains heading away from Washington. In the early 2000s a single unpowered EMD F cab unit, #7100 (ex-Baltimore & Ohio Railroad F7 #4553), occasionally substituted for a cab car. In addition to serving as a Non-Powered Control Unit, the unit is also outfitted with a head-end power generator to supply electricity to the train.[58]

To cope with increasing ridership, the MTA announced in August 2008 the acquisition of 13 Kawasaki bi-level passenger cars from VRE, originally scheduled to be placed in service by November 2008. The first units were placed in service in mid-January 2009 on the Brunswick line. The MTA has announced that all 13 cars will be placed in service on the Brunswick Line to replace the aging ex-Metra gallery cars.[59] These units have seats with a slightly different design facing towards the center of the cars (as opposed to facing the ends as on the original MARC cars). The ex-VRE cab cars (7855–7858) also use conventional ditch lights as opposed to the gyra lights used on the original MARC III cab cars. The $22 million purchase is a 10% increase in fleet size from 122 passenger cars.[59] However, due to an increase in ridership, the ex-Metra cars have remained in service along the Brunswick Line and the ex-VRE cars operate across all 3 lines.

In 2011 MARC ordered 54 new bi-levels from Bombardier to increase capacity. The cars were purchased using an un-exercised option from NJ Transit. The MARC order consists of 39 trailers and 15 cab cars. The cars will replace the MARC IIA single level cars and gallery cars, resulting in a net increase of 16 cars.[60] Delivery followed in mid 2014, with the coaches entering service in the following months. The first cab cars were accepted for passenger service as of September 2016.

In 2016, SEPTA pulled their Silverliner V cars from service due to cracks found in their truck assemblies. To alleviate the reduction of service, SEPTA leased train cars from MARC (as well as Amtrak and NJ Transit).[61] As of September 17, 2016, two cab cars and twenty-one regular passenger cars from the MARC II series are leased.

During the summer of 2017, some coaches have been leased to Long Island Rail Road to allow their C3 cars to provide service on the Montauk Branch because of the usual high volume on that line during the summer. Each train is powered by two EMD DE30AC locomotives.

Incidents

1996

MARC Memorial in the grounds of the Brunswick train station.

On February 16, 1996, during the Friday evening rush hour, an eastbound train headed to Washington Union Station via the Brunswick Line collided with the westbound Amtrak Capitol Limited headed to Chicago via Pittsburgh. The collision occurred at Georgetown Junction on a snow-swept stretch of track just west of Silver Spring, Maryland. The crash left 11 people dead aboard the MARC train. Three died of injuries suffered in the impact alone, with the rest succumbing to the ensuing smoke and flames or a combination of the two. Engineer Ricky Orr and conductors Jimmy Major Jr. and Jim Quillen were among the victims. Eight Jobs Corps students also were killed during the accident.

The NTSB report concluded that the MARC crew apparently forgot the approach signal aspect of the Kensington color-position signal after making a flag stop at Kensington Station. The MARC train was operating in push mode with the cab control car out front. The Amtrak locomotives were in the crossover at the time of the collision; the MARC cab control car collided with the lead Amtrak unit, F40PH #255, rupturing its fuel tank and igniting the fire that caused most of the casualties. The second unit was a GE Genesis P40DC #811, a newer unit that has a fuel tank that is shielded in the center of the frame. The official investigation also suggests that the accident might have been prevented if a human-factors analysis had been conducted when modifications to the track signaling system were made in 1992 with the closing of nearby QN tower.

2008

On February 7, 2008, a train derailed at Union Station after it was hit by an Amtrak switcher locomotive. The train was still unloading passengers at the time of impact, and seven people received minor head and neck injuries. The Amtrak locomotive was attempting to couple to the train and was reportedly moving too fast.[citation needed]

2010

Two significant events in 2010 received official response.

On June 21, 2010, northbound Amtrak-operated Penn Line train 538 broke down at 6:23 p.m. Temperatures inside the train reached 100 degrees due to malfunctioning air conditioning. After passengers called 911, 10 people were treated at the scene for heat-related problems. All passengers were cleared from the scene by 9:40 pm.[62] This incident prompted MDOT Secretary Beverley Swaim-Staley to apologize to customers aboard Penn Line train 538 on June 27, 2010.

On June 28, an Amtrak engineer operating a MARC train overran a scheduled stop in Odenton, without notice to passengers. Secretary Swaim-Staley was aboard the train at the time, and issued public statements about the situation. Amtrak CEO Joseph H. Boardman apologized to riders the following morning.

This pair of events prompted Amtrak to draft an emergency response plan for broken down MARC trains.[63]

Proposed service expansion

In the first decade of the 21st century ridership increased significantly, and the system neared capacity for its current configuration. With the area population growing and the BRAC process poised to bring new jobs to Aberdeen Proving Ground and Ft. Meade, both of which are served by nearby stations, the state saw the need to expand service to accommodate growth. In September 2007, MTA Maryland unveiled an ambitious 30-year plan of system improvements. Though funding sources had not been established at that time, the plan represented the state's goals of increasing capacity and flexibility. Proposed improvements included:[64]

  • Acquisition of new equipment. 54 Bombardier MultiLevels were ordered to replace aging single-level cars.
  • Weekend service on the Penn Line. Service began on December 7, 2013, between Baltimore and Washington, D.C., (with some trips extending to Martin State Airport). There are 9 round trips on Saturday (three begin and three then later end at Martin State Airport) and 6 round trips on Sunday (two begin and two then later end at Martin State Airport).[65]
  • Increased mid-day service and reverse commute service on the Camden and Brunswick Lines. As of 2015, there is a somewhat limited reverse commute service in effect on the Camden Line.
  • Extension of service past Union Station to L'Enfant and Northern Virginia along tracks used by VRE trains, thus relieving pressure on the Washington Metro.
  • More daily trips east of Penn Station, including improved service to Aberdeen Proving Ground.
  • Service beyond Perryville to Newark, Delaware, or Wilmington, Delaware, providing a connection to SEPTA Regional Rail's Wilmington/Newark Line.
  • New or expanded tunnels along the Northeast Corridor in Baltimore.
  • New stations in Baltimore, providing direct connections with the Metro Subway, and service to Johns Hopkins Hospital and Bayview Medical Center.
  • Rapid transit-like service through Baltimore.

While many of these proposals would require expensive capital improvement and years or decades to implement, the agency would like to put others into action as quickly as possible, suggesting that, for instance, Penn Line weekend service could have begun as early as 2008. However, budgetary issues have delayed any such expansions. In Spring 2009, to offset such budget shortfalls, ticket sales employees at most non-Amtrak stations were replaced with Amtrak "Quik-Trak" touchscreen ticket machines, and some train services have been eliminated or scaled back. For example, Train 871, the 1:30 pm train on the Brunswick line, now operates only on Fridays. Ticket machines were also added to stations that were not previously staffed, such as Halethorpe. The only remaining staffed stations, Odenton and Frederick, are staffed by Commuter Direct.[66][67]

References

  1. ^ "Transit Ridership Report Second Quarter 2016" (pdf). American Public Transportation Association. August 22, 2016. Retrieved January 9, 2017 – via http://www.apta.com/resources/statistics/Pages/ridershipreport.aspx. {{cite web}}: External link in |via= (help)
  2. ^ "Transit Ridership Report Fourth Quarter 2015" (pdf). American Public Transportation Association. March 2, 2016. Retrieved July 23, 2016 – via http://www.apta.com/resources/statistics/Pages/ridershipreport.aspx. {{cite web}}: External link in |via= (help)
  3. ^ "Transit Information Overview". Maryland Transit Administration. Retrieved June 24, 2011.
  4. ^ Starcic, Janna (June 17, 2016). "Maryland's MARC Railroad Upgrades Fleet, Service to Bolster Ridership". Metro Magazine. Retrieved December 22, 2017. {{cite news}}: Cite has empty unknown parameter: |dead-url= (help)
  5. ^ "MARC Brunswick Line Timetable" (PDF). MTA Maryland. March 2017. Retrieved March 19, 2017.
  6. ^ "MARC Camden Line Timetable" (PDF). MTA Maryland. March 2017. Retrieved March 19, 2017.
  7. ^ "MARC Penn Line Weekday Schedule" (PDF). MTA Maryland. November 2017. Retrieved November 29, 2017.
  8. ^ Yvonne Wenger and Natalie Sherman (December 7, 2013). "MARC train weekend service begins". The Baltimore Sun. Retrieved December 8, 2013.
  9. ^ a b Dilts, James D. (1996). The Great Road: The Building of the Baltimore and Ohio, the Nation's First Railroad, 1828–1853. Palo Alto, CA: Stanford University Press. p. 157. ISBN 978-0-8047-2629-0.
  10. ^ Matt Van Hatten (June 30, 2006). "Maryland Rail Commuter (MARC)". Trains Magazine. Archived from the original on December 4, 2008. Retrieved February 16, 2010. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  11. ^ Stakem, Patrick H. MARC, Maryland Area Rail Commuter, A Rider’s Guide, 2008, PRB Publishing, ASIN B004U7FKQS
  12. ^ Stover, John F. (January 1, 1995). History of the Baltimore and Ohio Railroad. Purdue University Press. ISBN 9781557530660.
  13. ^ "Southern Maryland Commuter Rail Service Feasibility Study" (PDF). Maryland Transit Administration. August 2009.
  14. ^ Baer, Christopher T. (April 2015). "A GENERAL CHRONOLOGY OF THE SUCCESSORS OF THE PENNSYLVANIA RAILROAD COMPANY AND THEIR HISTORICAL CONTEXT: 1902" (PDF). Pennsylvania Railroad Technical and Historical Society.
  15. ^ Baer, Christopher T. (April 2015). "A GENERAL CHRONOLOGY OF THE SUCCESSORS OF THE PENNSYLVANIA RAILROAD COMPANY AND THEIR HISTORICAL CONTEXT: 1968" (PDF). Pennsylvania Railroad Technical and Historical Society.
  16. ^ "Nationwide Schedules of Intercity Passenger Service". National Railroad Passenger Corporation (Amtrak). May 1, 1971. p. 6 – via The Museum of Railway Timetables.
  17. ^ Baer, Christopher T. (April 2015). "A GENERAL CHRONOLOGY OF THE SUCCESSORS OF THE PENNSYLVANIA RAILROAD COMPANY AND THEIR HISTORICAL CONTEXT: 1971" (PDF). Pennsylvania Railroad Technical and Historical Society.
  18. ^ Baer, Christopher T. (April 2015). "A GENERAL CHRONOLOGY OF THE SUCCESSORS OF THE PENNSYLVANIA RAILROAD COMPANY AND THEIR HISTORICAL CONTEXT: 1974" (PDF). Pennsylvania Railroad Technical and Historical Society.
  19. ^ a b c d e "History of MARC Train". Maryland Department of Transportation. Archived from the original on January 17, 2010.
  20. ^ "West Virginia State Rail Plan: Maryland Area Regional Commuter Service". West Virginia Department of Transportation, State Rail Authority. March 12, 2013.
  21. ^ a b c d e f g Baer, Christopher T. (April 2015). "A GENERAL CHRONOLOGY OF THE SUCCESSORS OF THE PENNSYLVANIA RAILROAD COMPANY AND THEIR HISTORICAL CONTEXT: 1980-89" (PDF). Pennsylvania Railroad Technical and Historical Society.
  22. ^ Baer, Christopher T. (April 2015). "A GENERAL CHRONOLOGY OF THE SUCCESSORS OF THE PENNSYLVANIA RAILROAD COMPANY AND THEIR HISTORICAL CONTEXT: 1976" (PDF). Pennsylvania Railroad Technical and Historical Society.
  23. ^ Baer, Christopher T. (April 2015). "A GENERAL CHRONOLOGY OF THE SUCCESSORS OF THE PENNSYLVANIA RAILROAD COMPANY AND THEIR HISTORICAL CONTEXT: 1977" (PDF). Pennsylvania Railroad Technical and Historical Society.
  24. ^ a b Baer, Christopher T. (April 2015). "A GENERAL CHRONOLOGY OF THE SUCCESSORS OF THE PENNSYLVANIA RAILROAD COMPANY AND THEIR HISTORICAL CONTEXT: 1977" (PDF). Pennsylvania Railroad Technical and Historical Society.
  25. ^ Shifrin, Carole (October 24, 1980). "BWI Airport Rail Link Celebrates Opening". The Washington Post. p. D3 – via Proquest Historical Newspapers. {{cite news}}: Unknown parameter |subscription= ignored (|url-access= suggested) (help)
  26. ^ "Commuter Trains' New Stop: Beltway Station". The Washington Post. August 11, 1982. p. MD11 – via Proquest Historical Newspapers. {{cite news}}: Unknown parameter |subscription= ignored (|url-access= suggested) (help)
  27. ^ Lynton, Stephen J. (June 9, 1983). "Baltimore-D.C. Commuter Train Trips to Increase". The Washington Post. p. B8 – via Proquest Historical Newspapers. {{cite news}}: Unknown parameter |subscription= ignored (|url-access= suggested) (help)
  28. ^ Fuchs, Tom (April 2009). "30th Anniversary of New Carrollton Station" (PDF). Transit Times. 23 (2): 5.
  29. ^ "Metro Parking Spots Rented to Amtrak For Temporary Use at New Carrollton". The Washington Post. October 28, 1983. p. C12 – via Proquest Historical Newspapers. {{cite news}}: Unknown parameter |subscription= ignored (|url-access= suggested) (help)
  30. ^ "New New Carrollton station". Amtrak. 1983.
  31. ^ "Bulletin Board". The Washington Post. May 28, 1981. p. MD9 – via Proquest Historical Newspapers. {{cite news}}: Unknown parameter |subscription= ignored (|url-access= suggested) (help)
  32. ^ Reid, Bruce (May 1, 1991). "Commuter rail, Perryville to Baltimore, starts today: MARC line's new Susquehanna Flyer out to attract commuters. ALL ABOARD!". The Baltimore Sun.
  33. ^ Lee, Edward (July 24, 1993). "MARC plans to raise fares 19 percent boost to be proposed". The Baltimore Sun.
  34. ^ a b Hedgpeth, Dana (June 22, 1995). "600 spaces to be added to MARC station parking lot by spring". The Baltimore Sun.
  35. ^ Worden, Amy (August 3, 1989). "Columbia Commuters Get a Station Break: Convenience Touted at New MARC Stop in Savage Station Opens in Savage". The Washington Post – via Proquest Historical Newspapers. {{cite news}}: Unknown parameter |subscription= ignored (|url-access= suggested) (help)
  36. ^ Meyer, Eugene L. (December 10, 1993). "LUKEWARM THRILL AT END OF LINE". The Washington Post.
  37. ^ Jensen, Peter (January 18, 1994). "MARC is off to the races Jan. 31". The Baltimore Sun.
  38. ^ Fehr, Stephen (December 12, 1994). "Commuter Lines Add Stations in Va. and Md". The Washington Post. p. D3 – via Proquest Historical Newspapers. {{cite news}}: Unknown parameter |subscription= ignored (|url-access= suggested) (help)
  39. ^ Spellmann, Karyn (July 8, 1996). "State DOT Considers New Road near Dulles". The Washington Times – via Highbeam Research. {{cite news}}: Unknown parameter |subscription= ignored (|url-access= suggested) (help)
  40. ^ Logan, Mary (December 1, 2005). "MAJOR TRANSPORTATION MILESTONES IN THE BALTIMORE REGION SINCE 1940" (PDF). Baltimore Metropolitan Council. p. 12. Archived from the original (PDF) on December 27, 2010. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  41. ^ "News and Upcoming Events" (PDF). Transit Times. 1 (2). Action Committee for Transit. Summer 1987.
  42. ^ "Md. Commuters Get Another Way to Go". The Washington Post. July 9, 1987 – via Proquest Historical Newspapers. {{cite news}}: Unknown parameter |subscription= ignored (|url-access= suggested) (help)
  43. ^ "MARC to seek new operator for CSX-run routes". Trains Magazine. June 14, 2010. Retrieved June 14, 2010.
  44. ^ Shaver, Katherine (July 7, 2010). "Holocaust group faults VRE contract". The Washington Post.
  45. ^ "No way to run a railroad". WBAL TV. March 3, 2011. Retrieved September 1, 2012.[permanent dead link]
  46. ^ Phillips, Don. "Lawsuits, Commuter Trains and the Holocaust." Trains July 2011: P. 11.
  47. ^ Lind, Michael (June 5, 2011). "No way to run a railroad". The Washington Post.
  48. ^ Rubin, Neil (February 10, 2012). "State archivist SNCF archives might not be enough". Baltimore Jewish Times.
  49. ^ Sohr, Nicholas (November 21, 2011). "MD MTA Keolis mum on bids to run MARC lines". The Daily Record via masstransitmag.com.
  50. ^ a b Weir, Kytja (October 17, 2012). "Bombardier wins $204m MARC commuter train contract". The Washington Examiner. Retrieved October 28, 2012.
  51. ^ Shaver, Katherine (October 17, 2012). "New company to operate some MARC trains". The Washington Post. Retrieved December 18, 2012.
  52. ^ a b "MARC Riders Advisory Council Meeting Minutes" (PDF). MTA Maryland. September 21, 2017.
  53. ^ "MARC Riders Advisory Council Meeting Minutes" (PDF). MTA Maryland. April 20, 2017.
  54. ^ "MTA Expands MARC Penn Line Service". MTA Maryland Service Information. Archived from the original on March 31, 2009. Retrieved February 16, 2010. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  55. ^ Dresser, Michael (August 8, 2015). "MTA seeks $58 million for new MARC engines". The Baltimore Sun. Retrieved August 10, 2015.
  56. ^ "Maryland Board of Public Works approves contract for MARC locomotives". Railway Age. September 18, 2015. Retrieved September 22, 2015.
  57. ^ http://mta.maryland.gov/marc-train-awards-368-million-contract-bombardier-transportation-overhaul-63-bi-level-rail-cars
  58. ^ "The MARC 7100 Returns! (November 1999 CSX Railfan Magazine)". Trainweb.org. Retrieved September 1, 2012.
  59. ^ a b Michael Dresser (August 20, 2008). "New cars may ease MARC crowding". The Baltimore Sun. pp. 1B, 6B.
  60. ^ "Governor O'Malley Announces Marc to Purchase 54 Multi-level Passenger Cars". MTA Maryland. November 2, 2011. Retrieved September 1, 2012.
  61. ^ "New schedule and five more cars for SEPTA Regional Rail". The Philadelphia Inquirer. July 17, 2016. Retrieved July 17, 2016.
  62. ^ Shaver, Katherine (June 23, 2010). "900 riders stuck on MARC train for more than two hours with no air conditioning". The Washington Post. Retrieved June 30, 2010.
  63. ^ Shaver, Katherine (July 1, 2010). "Amtrak unveils plan to dispatch help when MARC trains break down". The Washington Post. ISSN 0740-5421. Retrieved July 7, 2010.
  64. ^ "MARC Growth & Investment Plan" (PDF). MTA Maryland. September 2007. Archived from the original (PDF) on February 27, 2009. Retrieved February 16, 2010. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  65. ^ "Penn Line Weekend Schedule" (PDF). MTA Maryland. June 2017. Retrieved July 25, 2017.
  66. ^ "Odenton station is now a Commuter Direct Store". MTA Maryland. September 2009.
  67. ^ "Commuter Direct Store Locations". Commuter Direct. March 2015.

External links

KML is from Wikidata