Draft:Burnham Greenway: Difference between revisions
added more sources |
Submitting using AfC-submit-wizard |
||
Line 1: | Line 1: | ||
⚫ | |||
{{Draft topics|north-america}} |
|||
{{AfC topic|other}} |
|||
{{AfC submission|||ts=20240501205323|u=Thistheyear2023|ns=118}} |
|||
{{AfC submission|t||ts=20240122003528|u=Thistheyear2023|ns=118|demo=}} |
{{AfC submission|t||ts=20240122003528|u=Thistheyear2023|ns=118|demo=}} |
||
{{improve categories|date=October 2023}} |
{{improve categories|date=October 2023}} |
||
⚫ | |||
{{Infobox cycling path |
{{Infobox cycling path |
||
| name = Burnham Greenway |
| name = Burnham Greenway |
Latest revision as of 20:53, 1 May 2024
Review waiting, please be patient.
This may take 3 months or more, since drafts are reviewed in no specific order. There are 3,284 pending submissions waiting for review.
Where to get help
How to improve a draft
You can also browse Wikipedia:Featured articles and Wikipedia:Good articles to find examples of Wikipedia's best writing on topics similar to your proposed article. Improving your odds of a speedy review To improve your odds of a faster review, tag your draft with relevant WikiProject tags using the button below. This will let reviewers know a new draft has been submitted in their area of interest. For instance, if you wrote about a female astronomer, you would want to add the Biography, Astronomy, and Women scientists tags. Editor resources
Reviewer tools
|
This page needs additional or more specific categories. (October 2023) |
Burnham Greenway | |
---|---|
Length | 5.3 miles (8.5 km)[1] |
Location | Chicago, Illinois, U.S. |
Established | 1963 |
Use | Cycling, skateboarding, scootering, personal transporter, and pedestrians |
Difficulty | Easy |
Season | Limited access during winter |
Trail map | |
The Burnham Greenway is a 5.3-mile-long (8.5 km) rail trail and partial shared-use path for walking, jogging, skateboarding, and cycling, located along the southside of Chicago, Illinois.[1] There is a project underway to connect the disparate sections of the trail.[2][3]The project has an estimated completion date of 2027.[4]
See also[edit]
References[edit]
- ^ a b "Burnham Greenway". Trail Link. Retrieved 2024-01-21.
- ^ "Cook County Department of Transportation and Highways Burnham Multimodal Connector Preliminary Engineering and Environmental (Phase I) Study". Village of Burnham. Retrieved 2024-01-21.
- ^ Evans, Maxwell (2023-07-06). "The South Side Needs Better Bike Infrastructure. These Big Projects Aim To Close 'Notable Gaps'". Block Club Chicago. Retrieved 2024-05-01.
- ^ "County, CDOT hosted bike ride to look at the strengths and weaknesses of SE Side bike infrastructure - Streetsblog Chicago". chi.streetsblog.org. 2023-08-23. Retrieved 2024-05-01.
External links[edit]