User contributions for Robert Hack
Appearance
Results for Robert Hack talk block log uploads logs global block log global account filter log
A user with 452 edits. Account created on 26 December 2005.
7 January 2018
- 23:1423:14, 7 January 2018 diff hist −2 NGC No edit summary
- 23:1423:14, 7 January 2018 diff hist +83 NGC No edit summary
1 May 2011
- 00:2500:25, 1 May 2011 diff hist −23 m Slope stability probability classification →Further reading
- 00:2400:24, 1 May 2011 diff hist −2 m Slope stability probability classification →Further reading
- 00:2300:23, 1 May 2011 diff hist +2 m Slope stability probability classification →Further reading
- 00:1700:17, 1 May 2011 diff hist +51 m Slope stability probability classification →Further reading
28 March 2011
- 18:0718:07, 28 March 2011 diff hist +4 m Triaxial shear test →Basic concept
- 18:0418:04, 28 March 2011 diff hist +28 m Triaxial shear test No edit summary
26 March 2011
- 06:0306:03, 26 March 2011 diff hist +49 m Shear strength (discontinuity) No edit summary
- 06:0206:02, 26 March 2011 diff hist +6 Discontinuity (geotechnical engineering) No edit summary
- 06:0206:02, 26 March 2011 diff hist +49 Discontinuity (geotechnical engineering) No edit summary
- 05:5705:57, 26 March 2011 diff hist +14,445 N Sliding criterion (geotechnical engineering) ←Created page with ''''Sliding criterion (Discontinuity)''' The '''sliding criterion''' is a tool to estimate easily the shear strength properties o...'
- 05:2905:29, 26 March 2011 diff hist −37 m Slope stability probability classification No edit summary
- 05:0205:02, 26 March 2011 diff hist −10 m Slope stability probability classification No edit summary
- 04:4004:40, 26 March 2011 diff hist +569 Asperity (materials science) No edit summary
- 04:3504:35, 26 March 2011 diff hist +58 m Asperity (geotechnical engineering) No edit summary
- 04:2504:25, 26 March 2011 diff hist +47 m Surface roughness No edit summary
- 04:1704:17, 26 March 2011 diff hist +68 m Discontinuity (geotechnical engineering) No edit summary
- 04:1304:13, 26 March 2011 diff hist +60 m Asperity (geotechnical engineering) No edit summary
- 04:0804:08, 26 March 2011 diff hist +454 m Surface roughness No edit summary
- 03:5603:56, 26 March 2011 diff hist +148 m Joint (disambiguation) No edit summary
25 March 2011
- 16:2916:29, 25 March 2011 diff hist +54 N Joint spacing ←Redirected page to Discontinuity (Geotechnical engineering)
- 16:2816:28, 25 March 2011 diff hist +54 N Joint infill ←Redirected page to Discontinuity (Geotechnical engineering)
- 16:2816:28, 25 March 2011 diff hist +54 N Discontinuity infill ←Redirected page to Discontinuity (Geotechnical engineering)
- 16:2616:26, 25 March 2011 diff hist +41 N Joint persistence ←Redirected page to Persistence (Discontinuity)
- 16:2316:23, 25 March 2011 diff hist +16 m Discontinuity (geotechnical engineering) No edit summary
- 16:2116:21, 25 March 2011 diff hist +1 m Discontinuity (geotechnical engineering) No edit summary
- 16:2116:21, 25 March 2011 diff hist +57 m Discontinuity (geotechnical engineering) No edit summary
- 16:1616:16, 25 March 2011 diff hist +51 N Discontinuity spacing ←Created page with '#REDIRECT[Discontinuity (Geotechnical engineering)]'
- 16:1416:14, 25 March 2011 diff hist +14 m Joint (geology) No edit summary
- 16:1116:11, 25 March 2011 diff hist +24 m Shear strength (discontinuity) No edit summary
- 05:5505:55, 25 March 2011 diff hist −89 m Shear strength (discontinuity) No edit summary
24 March 2011
- 20:5120:51, 24 March 2011 diff hist +396 Shear strength (discontinuity) No edit summary
- 20:3520:35, 24 March 2011 diff hist +343 Shear strength (discontinuity) No edit summary
23 March 2011
- 10:0110:01, 23 March 2011 diff hist −10 Slope stability probability classification No edit summary
- 09:5609:56, 23 March 2011 diff hist −16 Slope stability probability classification No edit summary
20 March 2011
- 04:0204:02, 20 March 2011 diff hist 0 File:SlidingcriterionRl.jpg uploaded a new version of "File:SlidingcriterionRl.jpg": Resulotion
- 04:0104:01, 20 March 2011 diff hist +119 N File:SlidingcriterionRs.jpg Sliding criterion (Discontinuity) - Small scale roughness - Hack, 2011
- 02:5402:54, 20 March 2011 diff hist −143 m Discontinuity (geotechnical engineering) No edit summary
19 March 2011
- 13:3913:39, 19 March 2011 diff hist 0 File:SlidingcriterionRl.jpg uploaded a new version of "File:SlidingcriterionRl.jpg": Sliding criterion; Large scale roughness - Hack, 2011
- 13:3113:31, 19 March 2011 diff hist +95 N File:SlidingcriterionRl.jpg Sliding criterion (Discontinuity) - Hack, 2011
18 March 2011
- 20:0720:07, 18 March 2011 diff hist −21 Triaxial shear test No edit summary
- 20:0620:06, 18 March 2011 diff hist +2 Unconsolidated ←Redirected page to Consolidation (soil)
- 20:0520:05, 18 March 2011 diff hist −2 Unconsolidated No edit summary
- 20:0120:01, 18 March 2011 diff hist +70 Triaxial shear test No edit summary
- 19:5319:53, 18 March 2011 diff hist +388 Triaxial shear test No edit summary
- 19:4719:47, 18 March 2011 diff hist +742 Triaxial shear test No edit summary
- 19:2719:27, 18 March 2011 diff hist +73 Triaxial shear test No edit summary
- 19:2119:21, 18 March 2011 diff hist +357 Triaxial shear test No edit summary
- 19:0919:09, 18 March 2011 diff hist +163 Triaxial shear test No edit summary