Michoud Assembly Facility

Coordinates: 30°01′30″N 89°54′54″W / 30.025000°N 89.915000°W / 30.025000; -89.915000
From Wikipedia, the free encyclopedia
Michoud Assembly Facility
Top to bottom, left to right: Aerial view of MAF in January 2020, the factory floor, Artemis 1 liquid oxygen tank in the South Vertical Assembly Building, and the entrance to the lobby and administration offices.
Michoud Assembly Facility is located in Louisiana
Michoud Assembly Facility
Location in Louisiana
Michoud Assembly Facility is located in the United States
Michoud Assembly Facility
Michoud Assembly Facility (the United States)
Map
Built1940
LocationNew Orleans East
Coordinates30°01′30″N 89°54′54″W / 30.025000°N 89.915000°W / 30.025000; -89.915000
IndustryAerospace
ProductsRockets stages and parts
Employees4,200
ArchitectAndrew Higgins[1]
Buildings4
Area832 acres (337 ha)
Owner(s)NASA

The Michoud Assembly Facility (MAF) is an 832-acre (1.3 sq mi; 3.4 km2) manufacturing complex owned by NASA in New Orleans East, a section of New Orleans, Louisiana, in the United States. Organizationally it is part of NASA's Marshall Space Flight Center, and is currently a multi-tenant complex[2] to allow commercial and government contractors, as well as government agencies, to use the site.

MAF is one of the largest manufacturing plants in the world with 43 environmentally controlled acres—174,000 m2 (1,870,000 sq ft)—under one roof, and it employs more than 4,200 people.[3] From September 1961 to the end of the Apollo program in December 1972 the site was utilized by Chrysler Corporation to build the first stages of the Saturn I and Saturn IB, later joined by Boeing Corporation to build the first stage of the Saturn V rockets.[4] From September 5, 1973, to September 20, 2010, the factory was used for the construction of the Space Shuttle's external fuel tanks by Martin Marietta Corporation.[5]

History[edit]

A large horizontal rocket with USA painted on the side inside of a manufacturing facility
First stages of Saturn V rockets being assembled at the Michoud factory in the 1960s

The facility was originally constructed in 1940 at the village of Michoud, Louisiana, by the Higgins-Tucker division of Higgins Industries under the direction of Andrew Jackson Higgins. Construction was done on behalf of the United States government for the war production during World War II of plywood C-76 cargo planes and the Higgins Boat landing craft. The project cost $180 million ($2.8 billion in 2018).[6] Production of the C-76 never commenced and instead produced 2 Curtiss C-46 Commando in 1943 and remaining order cancelled in 1944. The facility was referred to as Michoud (Factory) Airfield in the 1940s and briefly as a National Guard field in 1949, but became inactive by 1952.[7] During the Korean War it made engines for Sherman and Patton tanks, and boasted a 1,700-metre (5,500 ft) paved runway. It came under the management of NASA in 1961, and was used for the construction of the S-IC first stage of the Saturn V rockets and the S-IB first stage of the Saturn IB rockets built by Chrysler Corporation. It is home to the first stage of the last-constructed Saturn V, SA-515, built by The Boeing Company. The factory's ceiling height limitation - 12 meters, was unable to allow the construction of the bigger Saturn C-8 direct Moon vehicle, and therefore was one of the major reasons why the smaller C-5 (later renamed Saturn V) was chosen instead of the originally planned Moon vehicle. The runway was slowly transformed into Saturn Boulevard in the 1960s with the middle becoming a heliport and decommissioned by the 1970s.[7]

The majority of the NASA factory's history was focused on construction and production of NASA's Space Shuttle external tank (ET). Beginning with the rollout of ET-1 on June 29, 1979, which flew on STS-1, 136 tanks were produced throughout the Space Shuttle program, ending with the flight-ready tank ET-122, which flew on STS-134, rolled out on September 20, 2010.[8] A single tank produced at the facility, ET-94, was not used in spaceflight and remained at Michoud as a test article.[5][9]

Modular parts for the International Space Station were fabricated at the facility in the mid-1990s until 2010.[10]

The factory is now the location for the Space Launch System (SLS)'s core and future second stage construction by Boeing.[11][12][13] SLS is the most powerful rocket in the history of spaceflight. It carries the Orion spacecraft, whose crew module is also being built at Michoud, but by Lockheed Martin.[14][15][16][17][18] It has 50% more volume than the Apollo command capsule and will carry four to six astronauts.[19] The first launch occurred on November 16, 2022.[20][21]

Hurricane Katrina[edit]

A section of eastern New Orleans after Hurricane Katrina. The Michaud Assembly Facility (MAF) at right (green) is not flooded, while the surrounding neighborhoods (dark greenish brown) are extensively flooded.

The facility did not experience significant flooding during Hurricane Katrina due to a natural ridge that runs along its northwestern boundary, the levee that makes up the southern and eastern boundaries, and the work of the pump operators who stayed to protect the facility during the storm. Several buildings sustained wind and rainwater damage. All shifts were initially canceled up to September 26, 2005, potentially setting back future Shuttle flights. All the buildings and the shuttle hardware within survived the hurricane without grave damage, but the roof of the main manufacturing building was breached and debris damaged ET-122 stored inside; that tank was refurbished and later flew on the final flight of Space Shuttle Endeavour, STS-134. Thirty-eight NASA and Lockheed Martin employees stayed behind during Hurricane Katrina to operate the pumping systems, knowing that if not activated and sustained, the facility would have been destroyed. The workers pumped more than one billion gallons (3,800,000 m3) of water out of the facility and probably were the reason that the rocket factory suffered very little damage. These employees were each awarded the NASA Exceptional Bravery Medal, NASA's highest bravery award.[22]

On September 16, 2005 NASA announced that the repairs were progressing faster than anticipated,[23] and so they would continue to use Michoud for external tank work. On October 3, 2005, the facility officially reopened for essential personnel, though some key personnel had returned earlier. On October 31, 2005 the facility reopened to all personnel.

On February 7, 2017, an EF3 tornado carved a path through Orleans Parish, in which the factory is located. Two major buildings including the main manufacturing building were damaged, with multiple broken windows. 5 people were injured, and resulting repairs and other factors contributed to the delay of the first SLS launch until late 2022.[24][25][26]

Buildings[edit]

Welding of the SLS liquid oxygen tank in the South Vertical Assembly Building

The facility consists of various buildings in one complex:

  • The main manufacturing building (Building number 103), and the North and South Vertical Assembly Buildings (Building numbers 115 and 110 respectively). The North VAB was constructed in 2011, initially to add new vertical welding equipment. The main manufacturing building is where the majority of preliminary fabrication and welding activities take place - the Space Launch System core stage (and previously the Space Shuttle External Tank, ISS modular components, and the Saturn V first stage) were manufactured here. Engine installation for the SLS core stage for Artemis 1 and 2 occurs here.[27] The building stretches 512 by 340 meters in dimensions, and contains over 40 sub-areas for different manufacturing and structural assembly operations. A series of internal roads made from polished concrete provide ease of access by factory vehicles, trams, and overhead cranes to move components around. They run the whole length of the factory building. Factory floor office buildings and engineering rooms located in various ends of the main manufacturing building. Near the South VAB is an electric arc furnace and casting equipment.[28] In front of the main manufacturing building is the administration offices, lobby, restaurants and engineering conference rooms. There is also a gym, media lab, a medical area and a cafeteria provided for the workers.[29] Facing north is a factory floor museum display area, with mission patches, flags and memorials.[30]
  • An external building that is used to manufacture smaller components and space station equipment, for example small components for the International Space Station. It also supplies various small components such as fasteners to the main building.[citation needed]
  • Another external building for various manufacturing processes, and contains a laboratory, office space and technical storage areas.[citation needed]
  • Adjacent to the main manufacturing building are more foam application workshops, power transformers for the arc furnace and other facilities, and large amounts of open space. [31]In front of the South VAB, rocket parts are moved from this building to the side internal workshops across the plaza for inspection and checks. [32][33]
  • The National Finance Center (NSF) - was formerly located west of the complex; housed offices for the U.S. Department of Agriculture, and contained several large conference rooms, a restaurant and a ballroom for NASA employees and visitor events. The building was badly damaged by a tornado in 2017, which rendered the building irreparable. It was subsequently demolished in 2019 and a new replacement is yet to be built.

The shipping port is located 600 meters southwest of the main manufacturing building. Transporting vehicles carrying manufactured SLS components move down Saturn Blvd, past large open fields, to the pier - where the Pegasus Barge is docked. This is where the components are shipped to either their final destination - Kennedy Space Center, or rarely back to the main Marshall Space Flight Center in Huntsville, Alabama, or the John C. Stennis Space Center in Mississippi for testing.

Other and future activities[edit]

The Michoud main manufacturing building and the twin vertical assembly buildings as seen from a drone in January 2020. The Artemis 1 core stage is being rolled out, along with a crowd of workers

The Michoud Assembly Facility also houses other organizations such as the National Finance Center operated by the United States Department of Agriculture, the United States Coast Guard, and GE.[34][35]

The factory complex is open to the public (though through pre-booking in advance). Visitors must sign in at main reception and clear security.[36]

NASA planned to use the rocket factory to build the structure for several components of the cancelled Constellation program, including the Orion spacecraft, the Ares I Upper Stage, and the Ares V Core Stage. Under the Obama administration, the Constellation Program was cancelled in 2010,[37] but was replaced with SLS a year later to continue space exploration efforts.

NASA has an agreement in place to rent out a portion of the facility to Big Easy Studios, a New Orleans film studio.[38] This deal has been criticized by competing studios as violating NASA's rule that any deal with an outside entity must serve the agency's mission and must not compete with the private sector. NASA officials defend the agreement, stating that this helps to offset the cost of unused space on the facility and that their pricing is vetted by state and local economic development agencies to ensure it is not competing with the private market.[39] Portions of Ender's Game,[40] G.I. Joe: Retaliation,[41] and Dawn of the Planet of the Apes[citation needed] were filmed at the factory.

Incidents[edit]

On May 24, 1988, TACA Flight 110 operated with a Boeing 737-300 jetliner made a successful emergency landing on a grassy levee in the Michoud grounds after power was lost in both engines during a severe thunderstorm. The aircraft was towed into the Michoud facility, where its engines were replaced. On 6 June, it took off, with a crew of two and minimal fuel, using the former runway at Michoud,[42] which had been reused as a road, Saturn Boulevard.[43] It was flown the short distance to New Orleans International Airport, where it was fully repaired.[42]

Gallery[edit]

References[edit]

  1. ^ Higgins Industries
  2. ^ "Jacobs Technology". Jacobs Technology. Retrieved 2018-01-11.
  3. ^ "NASA.gov" (PDF). Archived from the original (PDF) on 2021-11-23. Retrieved 2017-06-17.
  4. ^ Curtis Redgap. "Fly Chrysler to the Moon: the Saturn Rockets". Allpar.com. Retrieved 2014-05-14.
  5. ^ a b Dean, James. "Michoud Declares End Of External Tank Production". Florida Today. Archived from the original on 10 October 2010. Retrieved 30 September 2010.
  6. ^ NASA.gov
  7. ^ a b "Abandoned & Little-Known Airfields: Louisiana: Eastern New Orleans area". www.airfields-freeman.com. Archived from the original on 10 September 2014. Retrieved 12 January 2022.
  8. ^ Sloss, Philip (22 September 2010). "MAF speak of their pride in returning ET-122 to the Shuttle manifest". NASASpaceFlight.com.
  9. ^ Tank ET-122 ended up being the last, even though its sequence number was lower than the total number of tanks produced, because it had been damaged during Hurricane Katrina and required repairs prior to completion.
  10. ^ NASA.gov
  11. ^ Sloss, Philip (4 March 2021). "NASA, Boeing looking to begin SLS Exploration Upper Stage manufacturing in 2021". NASASpaceFlight.com. Retrieved 26 December 2022.
  12. ^ Foust, Jeff (7 December 2022). "NASA and Boeing change SLS core stage assembly process". SpaceNews. Retrieved 26 December 2022.
  13. ^ Mohon, Lee (September 25, 2023). "All Engines Added to NASA's Artemis II Moon Rocket Core Stage – Artemis". NASA Blogs. Retrieved September 25, 2023.
  14. ^ Marshall Space Flight Center (January 2022). "NASA SLS Web Reference Guide 2022" (PDF). NASA. Retrieved 7 April 2022.
  15. ^ "Lockheed to build Nasa 'Moonship'". BBC News. August 31, 2006. Archived from the original on April 17, 2021. Retrieved December 26, 2022.
  16. ^ LaNasa, Shannon (2021). "Michoud Tenants: Lockheed Martin". Marshall Space Flight Center. NASA. Archived from the original on March 18, 2021. Retrieved December 26, 2022.Public Domain This article incorporates text from this source, which is in the public domain.
  17. ^ Cristina, Victoria (April 26, 2021). "Behind the scenes at NASA Michoud: Assembly of the Orion Crew Modules". WGNO. Nexstar Media Group. Retrieved December 26, 2022.
  18. ^ NASA Orion public relations [@NASA_Orion] (September 10, 2021). "Technicians at NASA's Michoud Assembly Facility completed the welding on Orion's pressure vessel which will carry @NASA_Astronauts to the Moon on #Artemis III" (Tweet) – via Twitter.
  19. ^ "NASA Names New Crew Exploration Vehicle Orion" (Press release). NASA. August 22, 2006. Archived from the original on April 8, 2021. Retrieved December 26, 2022.
  20. ^ Joey Roulette, Steve Gorman (16 November 2022). "NASA's next-generation Artemis mission heads to moon on debut test flight". Reuters. Retrieved 26 December 2022.
  21. ^ Clark, Stephen (26 April 2022). "NASA's moon rocket rolls back to Vehicle Assembly Building for repairs". Spaceflight Now. Retrieved 29 April 2022.
  22. ^ "NASA Administrator Honors Katrina Heroes" (Press release). NASA. 2006-01-05.
  23. ^ "NASA Planning to Resume Work at Michoud Assembly Facility" (Press release). NASA. 2005-09-16. Archived from the original on 2006-01-15. Retrieved 2005-10-03.
  24. ^ "Workers Repair Roof Damage to NASA's Rocket Factory | NASA". Nasa.gov. 2017-02-07. Retrieved 2018-01-11.
  25. ^ Dan Billow (2017-02-08). "NASA rocket factory damaged by violent winds". Wesh.com. Retrieved 2018-01-11.
  26. ^ Berger, Eric (2021-08-31). "NASA's big rocket misses another deadline, now won't fly until 2022". Ars Technica. Condé Nast. Retrieved 2021-09-18.
  27. ^ "SLS Rockets for Artemis 3 and 4 Being Assembled". Futuramic. August 2, 2022. Retrieved June 24, 2023.
  28. ^ NASA.gov
  29. ^ "Michoud Assembly Facility Amenities". NASA. Retrieved November 12, 2022.
  30. ^ "All About Visiting Michoud Assembly Facility (NASA's Rocket Factory)". SpaceTourismGuide.com. February 1, 2021. Retrieved November 12, 2022.
  31. ^ "MAF facilities". Retrieved November 7, 2023.
  32. ^ "Building Specifications, including PDF floorplans". December 2022. Retrieved November 7, 2023.
  33. ^ "Michoud Fitness Center". Retrieved November 7, 2023.
  34. ^ "All That Jazz: GE Opens Wind Turbine Blade Test Center At NASA Rocket Factory In New Orleans". GE.com. 2018-11-14. Retrieved 2019-06-07.
  35. ^ "GE expanding wind energy offshoot with 100 jobs at Michoud site". nola.com. 2018-11-08. Retrieved 2019-06-07.
  36. ^ "MAF Visitors and Tours". NASA. Archived from the original on November 23, 2021. Retrieved November 12, 2022.
  37. ^ "President Obama Signs New Vision for U.S. Space Exploration Into Law". Space.com, October 11, 2010.
  38. ^ WWLTV News Archived 2014-02-21 at the Wayback Machine
  39. ^ David Jacobs (2012-09-17). "NASA defends deal with N.O. film studio". Greater Baton Rouge Business Report. Archived from the original on 2014-05-15.
  40. ^ Jim Cheng. "Ender's Game filmed at NASA Michoud Assembly Facility" (Press release).
  41. ^ "'G.I. Joe' film crew member killed on set in New Orleans". NOLA.com. 2011-11-23.
  42. ^ a b "Emergency-shortened flight is completed". UPI. June 6, 1988. Retrieved 2 July 2018.
  43. ^ 30°00′59″N 89°55′13″W / 30.0164°N 89.9204°W / 30.0164; -89.9204 (Saturn Boulevard)

Further reading[edit]

External links[edit]