Dahongmen station
Appearance
General information | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Location | Nanyuan Road and Linhong Road (临泓路) Fengtai District, Beijing China | |||||||||||||||
Operated by | Beijing Mass Transit Railway Operation Corporation Limited | |||||||||||||||
Line(s) | Line 10 Line 8 (Not Opened) | |||||||||||||||
Platforms | 4 (1 island platform, 1 island platform unopened) | |||||||||||||||
Tracks | 4 | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Underground | |||||||||||||||
Accessible | Yes | |||||||||||||||
History | ||||||||||||||||
Opened | December 30, 2012 (line 10) Late 2024[2] (line 8) | |||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
|
Dahongmen station[1] (simplified Chinese: 大红门站; traditional Chinese: 大紅門站; pinyin: Dàhóngmén zhàn) is a station on Line 10 of the Beijing Subway.[3]
The Line 10 station opened on December 30, 2012.[4]
Currently, Line 8 trains pass through the station without stopping here. The station for Line 8 is expected to open in late 2024.[2]
Station layout
[edit]The line 10 and unopened line 8 station has underground island platforms.
Exits
[edit]There are 4 exits, lettered A1, A2, C, and D. Exits A1 and C are accessible.
References
[edit]- ^ a b "北京地铁线路图". 北京地铁. Archived from the original on 2024-03-13.
- ^ a b "8号线大红门站". 2024-03-08. Archived from the original on 2024-03-13.
施工单位已于今年1月份进场施工,预计于今年年底前完工并通车
- ^ 地铁10号线二期I段设计方案敲定 [Metro Line 10 two paragraphs I finalizing the design]. Capital Construction News (in Chinese). January 28, 2008. Archived from the original on 2014-11-01.
- ^ 轨道交通四条新线12月30日开通试运营 [Four new rail transit line December 30 opening of trial operation] (in Chinese). Beijing Municipal Transportation Administration Bureau. Archived from the original on May 11, 2013. Retrieved December 29, 2012.
39°50′43″N 116°23′57″E / 39.845383°N 116.399154°E